Laserfiche WebLink
<br />in t.he entire basin and flood plain zoning for lhe IOO-year flood. The <br />Pha~:e A report was formally accepted by th~~ Dif:-tric:t on December 21, <br />197 I,. <br /> <br />A draft report on the Phase 13 ba:::;ed tiLl rec:onunendations contained in <br /> <br /> <br />Pha~,e A was submitted to IJrban Drainag~ arlr! Plocld Control District on <br /> <br /> <br />Mare'h 30, 1975. FoJlowing discussi.ons, LhE~ Jrban Drainage and Flood <br /> <br />Control District notified Eel on December to, 1.976, i_ts desire to ch.ange <br /> <br /> <br />the scope of improvements as suggest(~d 1n Phase A report. Essentially, <br /> <br /> <br />iL involves the elimination of a dam at: Lh(, ;\oc:ky Mountain Arsenal, eli- <br /> <br /> <br />mina tion of most of the recommended i.mprovements east_ of Buckley Road <br /> <br />and provision of a 100-year flood challnel (:Iown~tream of O'Brian Canal <br /> <br /> <br />",..'itl- improvements to the ~,tructure:s in thi~~. reach. <br /> <br />Phase B, which is the subject of this report, consists of the pre- <br /> <br /> <br />liminary design for the selected plan in P~.ase A with the revisions con- <br /> <br /> <br />tained in the above referred letter. Notic'e to proceed wi,th the revised <br /> <br /> <br />Phase B was given in a letter from the Urb"n Drainage and Flood Control <br /> <br />District dated December 21, 1976. <br /> <br />9~;!!J~-' _.5~~_ _~_~~~J~ <br /> <br />The scope of the Phase B work is givell ,n paragraph 3B of t.he con- <br /> <br /> <br />tract. The objective is to provide prelimjnary designs for the approved <br /> <br /> <br />and revised Plan A in adequate detail to ))(Jrmit the District, Aurora, <br /> <br /> <br />Ci ty of Denver, Adams County and Arapahoe> Count)' to properly plan their <br /> <br />highways and drainage facilities, rj,ghts-of-~'ay, construction activities <br /> <br /> <br />and guide developers. <br /> <br />Briefly, the scope of work inc]u(ies: <br /> <br />1. Hydrology and llydrau11C:5 Del" ti2."1. <br /> <br />2. Preliminary Design. <br /> <br />3. Preliminary Cost Estimatp5. <br /> <br />These aspects of the work arc pr('sPJll~d i~ the two volumes of this <br />report. <br /> <br />I,,-2 <br />