Laserfiche WebLink
<br />THE WEILANO ENGINEERING CO. <br />DINVIR . PUULO . CANON CITY <br /> <br />SUBJECT <br /> <br />FLOF.ENCE FLOOD PF.OTECTIO!\ <br /> <br />ItXHIDIT <br /> <br />Plan 2. <br /> <br />Union Ditch 2.yphon across Sand Creek <br /> <br />!l!2,710.05 <br /> <br />Plan 4 a. <br /> <br />9096 cu.yds emb. and exc. " :;:0>' per (:u.yd, <br /> <br />::'1,619.60 <br /> <br />Right-of-way <br /> <br />_---*-60.40 <br /> <br />2,000.00 <br /> <br />Plan 6. <br /> <br />Oa:~ Creek Levee <br /> <br />7,551.50 <br /> <br />$100,916.37 <br />9.063.63 <br /> <br />Zngineering and contingBncies <br /> <br />Total for Corrbina tion "E" <br /> <br />$110,000.00 <br /> <br />1'nese figures readily shov: this latter coolbinatlon to be the cheaper of <br /> <br />the two proposeo.. In ao.dition, and finally, after careful investigation <br /> <br />and thoughtful consideration of all the phases of this problem, it is our <br /> <br />opinion that Combination "E" most completely and satisfactorily solves <br /> <br />Florence's needs in respect to flood protection and control.. <br /> <br />Very respectfully sublr.i tted, <br /> <br />The '::eiland :<:ngineering Company <br /> <br />Ey-~ia U {~_~~. -'. <br /> <br />fiGS/GC _____. .:=:J <br /> <br />1 ,_ <br />