My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD05940
CWCB
>
Floodplain Documents
>
Backfile
>
5001-6000
>
FLOOD05940
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:07:23 PM
Creation date
10/5/2006 1:53:04 AM
Metadata
Fields
Template:
Floodplain Documents
Designation Number
325
County
Teller
Community
Cripple Creek
Stream Name
Pony Gulch, Poverty Gulch
Basin
Arkansas
Title
Drainage Master Plan - Cripple Creek, Final Report
Date
4/1/1992
Designation Date
7/1/1992
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />TABLE VII.J <br /> <br />Item Dcscription Improvement Ouantity Unit Total <br /> Number Cost <br />18 10' Radial Inlct 24 4EA 2.500.00 10,000.00 <br />19 18" RCP with 5' + cover 25 250 LF 65.00 16,250.00 <br />20 48" RCP with 2' + cover 26 700 LF 100.00 70,000.00 <br />21 Spedallnlet 27 1 EA 2.250.00 2,250.00 <br />22 lS" CMP with 1'+ cover 28 40 LF 70.00 2,800.00 <br />23 30" CMP with IS:!: cover 29 40 LF 80.00 3,200.00 <br />24 24" CMP with 1'+ cover 30 40 LF 75.00 3,000.00 <br />25 Manholes on 36". 42" and 48" .. 7EA 2,000.00 14,000.00 <br /> stonn sewer outfall lines <br />26 Asphalt Replacement .. 1,200SY 15.00 18,000.00 <br />27 Utility Reloeations and Misc. .. 1 LS 20.000.00 20,000.00 <br /> Appurtenances <br />SUBTOTAL $366,550.00 <br />25% for Engineering, Legal and Contingencies S91,640.00 <br />TarAL COST $4511,190.00 <br /> <br />PRELIMINARY COST ESTIMATE <br /> <br />CRIPPLE CREEK DRAINAGE MASTER PlAN <br /> <br />SECOND STREET TRTRUTARY IMPROVEMENTS <br /> <br />Item Description Improvement Ouantity Unit Total <br /> Number Cost <br />1 24' CMP with 1':t cover 9 40LF S75.00 $3,000.00 <br />2 24"CMPwith 1'+ cover 10 40LF 75.00 3,00.00 <br />3 22"x36"arehculvertwith1.5:t 11 4aLF 95.00 3.800.00 <br /> cover <br />4 24" CMPwith 1'+ cover 12 40 IF 75.00 3,000.00 <br />5 48" RCP with 1.5:t cover and 13 40LF 200.00 8,000.00 <br /> concrete headwalls <br />6 22"x36" arch CMPwith l:t 14 40 LF 95.00 3,800.00 <br /> cover <br />7 54" Rep \Vith 1.5:t cover and 16 40 LF 220.00 8,800.00 <br /> concreteheadwalls <br />8 36" RCPwilh l.5:t cover 16 40LF 85.00 3,400.00 <br />9 Ripraplined channel with 2' 15 300 LF 80.00 24,000.00 <br /> hottomwidth, 3' flow depth <br /> and 2:1 side slopcs <br />10 42" RCP with 2+ cover 17 300 LF 95.00 28,500.00 <br />11 Inlcls, size varies 18 2EA 1,500.00 3,000.00 <br />12 42" RCPwith 2';!; cover 19 300LF 95.00 28,500.00 <br />13 24" CMPwith 1'+ cover 20 40 LF 75.00 3,000.00 <br />14 36" RCP with 2'+ cover 21 300 LF 85.00 25,500.00 <br />15 Special Inlet 21 1 EA 2,500.00 2,500.00 <br />16 42" RCPwith 2':!: cover 22 550 LF 95.00 52,250.00 <br />17 15' DlOR Inlet 23 1 EA J,OOO.OO J,OOOJlO <br /> <br />VII.S <br /> <br />VIl.6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.