Laserfiche WebLink
<br />CSUCE SCD DOLFI <br /> <br />719;:!.~~~046 <br /> <br />P.02 <br /> <br />. <br /> <br />n' "'=CT DESCRIPTION <br /> <br />DRAFT <br /> <br />'. .' A I .; EN BURG HYDROLOGY STUDY <br /> <br />28 November, 1994 <br /> <br />f' - _u"-- <br /> <br />';'. ~own Df Walsenburg has IDng used an existing, privately Dwned irrigatIon ditch as a means of <br />C . ;ng storm and runoff water from the Northern area of the community. To this poInt, the ditch has <br />adequate to handle this water and ditch owners have benefitted from the occasional <br />cqc.entation to nDrmal volume. There is, however, some Queuion as tD the capacity of the ditch to <br />: c, C u a majDr short term increase in storm waters such as might be encountered in a potential <br />. , jic flood. In additiDn, by building roads, curbs, gutters, and developing homesites over recent <br />.",'. the town has changed the natural water courses in the area. Finally, the ditch company, which <br />,,,., ' ,t except liability in the event of an overflow or flood caused by run-off, has expressed concern <br />" . the continued USlI of the ditch as a primary means of transporting excess runoff water. <br /> <br />. ~TIVE: To conduct a detailed hydrological study of the area of concern and, incorporating the <br />, of the study, suggest drainage processes alternative to the existing ditch. <br /> <br />",NTS OF THE PROJECT: <br /> <br />Using appropriate engineering techniques and guidelines, ascertain the potential geographical <br />, - ~rce and volume of water with which the community could be expected to cope. Work directlv <br />\ :h Enclneer Tom Brownina. Colorado Water Conservation Board. 1313 Sherman St. room 721. <br />nver, CO 80203. Phone 13031 866 3441 In olannlna and imDlementina this Droiect. <br /> <br />. :)etermine the existing carrying capacity of the ditch and compare it to the potential demand for <br />j linage established above. <br /> <br />. Evaluate the locale and suggest means for coping with runoff to both complement the carrying <br />'acity of the ditch in an emergency and, as an alternative, to handle runoff without using the <br />:h at all. Provide drawings and engineering data for these alternatives in as much detail as <br />,sible. <br /> <br />. ?rovide a detailed written report of findings with drawings, maps, illustrations as appropriate and <br />:;9 an oral presentation to appropriate local officials. <br /> <br />i :ISTRATIVE CONSIDERATIONS; <br /> <br />. his is a student project supervised by professional faculty. Additional professional engineering <br />,Jort will be required prior to implementation of any proposed solutions. <br /> <br />."he Town of Walsenburg will arrange for meals and accommodations for up to six students and <br />!Ity for not to exceed three nights and four days. Additional expenses will be provided for by <br />Colorado School of Mines and by the CSUCECDO. <br />