Laserfiche WebLink
<br />I I <br />I <br />I <br />II <br />, , <br />I <br />II <br />I <br />I <br />I <br />I <br />I <br />i I <br />! I <br />I-I <br />I <br />II <br />I <br />! I <br /> <br />based on land use, soil type, and basin physical features including size, length, slope, and <br /> <br />surface characteristics and the rainfall parameters. Existing land use for the study basin was <br /> <br />established by site visits and review of aerial photography, while future land use was <br /> <br />developed by coordinating information received from tbe City of Arvada Planning <br />Department and Jefferson County Zoning. <br /> <br />Sub-basin runoff was established by CUHP as indicated above, then routed using UDFCD's <br /> <br />Storm Water Management Model (UDSWM2-PC), In accordance with District policy, no <br /> <br />credit was given to detention facilities which are not publicly owned and maintained. <br /> <br />Basin modeling results show that the detention pond located at the Ralston Valley <br /> <br /> <br />development and 72nd Avenue, east of Eldridge Street, only controls runoff under an <br /> <br /> <br />existing two year design frequency. Less frequent events resulted in the detention pond <br /> <br /> <br />being overtopped. The lOO-year design frequency analysis indicated little attenuation of <br /> <br /> <br />flows passing through the detention pond. Table 1 indicates peak discharge at several key <br /> <br /> <br />locations in the basin for the frequencies studied. <br /> <br /> TABLE I <br /> SUMMARV OF PEAK DISCHARGES <br /> DISCHARGE (cr.) <br /> Location <br /> Detention <br /> Qua.ker St.1 Highline Canal Croke Canal Pondl <br />Fr~aue.cv Church Ditch North S2.Y1h North South Eldrid2e St. nod Ave ConOuence <br />2-yr. Existing 88 15 90 18 86 104 56 68 <br />Future 297 61 340 11 343 426 438 475 <br />5-yr. Existing 221 72 281 86 289 392 409 485 <br />Future 526 127 632 149 645 824 864 1019 <br />lO-yr. Existing 319 114 427 140 447 618 671 846 <br />Future 692 172 840 205 865 1110 1184 1423 <br />50-yr. :Existing 591 225 821 279 869 1213 1341 1723 <br />Future 1274 324 1558 397 1615 2117 2181 2135 <br />lOO-yr. Existing 839 320 1167 399 1239 1742 1832 2416 <br /> Future 1487 381 1836 470 1904 2502 2572 3312 <br />SOO-yr. .Exisling 1040 410 1520 470 1620 2180 2360 3160 <br /> Future 2000 510 2400 600 2570 3240 3410 4450 <br />.Log-normal Probability Distribution Extrapolation <br /> <br />The existing 9.0 acre-ft detention pond, located at tbe Ralston Valley development located <br /> <br />immediately upstream of 72nd Avenue, is included in tbe model. Existing depressions <br /> <br />located above the Croke Canal and Highline Canal are not modeled as it would be in <br /> <br />violation of UDFCD policy. In addition, modeling does not assume flow discharged into <br /> <br />the existing irrigation ditches in accordance to UDFCD policy. <br /> <br />-10- <br /> <br />-11- <br />