My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD05882
CWCB
>
Floodplain Documents
>
Backfile
>
5001-6000
>
FLOOD05882
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:07:11 PM
Creation date
10/5/2006 1:51:07 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
State of Colorado
Stream Name
All
Basin
Statewide
Title
Floodplain Study Review and Designation program - SOQ
Date
4/7/2000
Prepared For
State of Colorado
Prepared By
McLaughlin Water Engineers, Ltd.
Floodplain - Doc Type
Miscellaneous
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Jamie M. Cribbs, E.I.T. <br />Civil Engineer <br /> <br />MCI.aughlin Water Engineers, Ltd. <br /> <br />EXPERIENCE <br /> <br />Ms. Cribbs has project experience in the areas of surface and subsurface hydrology; water rights and water <br />resource engineering; and flood mitigation and river rehabilitaion. Experience also includes flood plain <br />analyses, drainage study and design, water rights analysis, and remediation and abatement plans. She is <br />proficient in Excel, HEC-II, HecRAS, and the GIS system, ArcView and ArcCAD. Visual Modflow and <br />MT3D96. and Surfer. <br /> <br />Project, Client. <br />and Location <br /> <br />Highland Park Association <br />Arapahoe County. Colorado <br /> <br />Town of Basalt <br />River Stability Project <br /> <br />Town of Superior <br />Drainage Master Plan <br /> <br />Farad Diversion Project <br />Sierra Pacific Power Company <br />Floriston, CA <br /> <br />American River <br />Bureau of Reclamation and <br />Placer County Water Agency <br />Auburn, California <br /> <br />Nebraska vs, Wyoming <br />U.S. Department of Justice <br /> <br />STD BIO <br /> <br />Position <br /> <br />Project Engineer <br /> <br />Project Engineer <br /> <br />Project Engineer <br /> <br />Assistant to <br />Geologist <br /> <br />Hydraulic <br />Engineer <br /> <br />Computer <br />Engineering <br />Support <br /> <br />Rl~~ponsibilities <br /> <br />Preliminary and I1nal design of drainage improvements. <br />Included channel improvement for I mile of shoreline <br />and detention facilities for an omce park consisting of <br />116 acres, Work included hydrologic modeling, <br />alternative analysis. cost estimating" preliminary and <br />final design of recommended alternative. The proposed <br />plan rec:ommended retro,fitting 2 detention facilities and <br />outfall structures into an existing aesthetic system, <br />stabilizing the existing channcl. and assisted in the <br />design of a recirculation line with fountains. <br /> <br />Hydraulic modeling using HEC,RAS for floodplain <br />analysis. Classified segments of the Roaring Fork River <br />using the Rosgen Classification System. <br /> <br />Update of drainage basin master plan, included <br />hydrology analysis, and alternative evaluation, <br /> <br />Determined drop structure and twin box culvert stability <br />through analysis of critical groundwater flow paths and <br />uplift pressure, Performed bedrock surface analysis <br />using Surfer and AutoCAD 14 with Softdesk, <br /> <br />Developed hydraulic model usingHEC,RAS, Computed <br />earthwork quantities for alternative diversion concepts. <br /> <br />Using ArcCAD and AreView. devcloped GIS for <br />analysis of depletions in the Platte River Basin. Used <br />GIS to establish estimates of groundwater withdrawals <br />in study area, queried databases from the State of <br />Wyoming for the U,S. Justice Department. <br />
The URL can be used to link to this page
Your browser does not support the video tag.