Laserfiche WebLink
<br />6 <br /> <br />After more discussion, the following decisions were made. <br />1. David Walker of CWCB would call a colleague in the USBR to determine the avail- <br />ability of additional funds. He will also explore sharing the additional cost <br />50-50 between the USBR and CWCB. <br />2. At the same time, Cliff Pugh will make a more refined estimate of the additional <br />funds that would be needed. <br />3. When the first 2 steps are completed, the group will meet again either at the <br />offices of UDFCD or WWE to determine the revised second model configuration of <br />the downstream embankment, if this is considered necessary. . <br />4. USBR personnel will continue to test and analyze measurements for the range of <br />boating flow rates on the model as it is now configured. <br /> <br />Submitted by <br />WRIGHT WATER ENGINEERS, INC. <br /> <br />~A <br /> <br /> <br /> <br />Ronald L. Rossmiller, PhD. PE <br />Project Manager <br /> <br />Approved <br /> <br />CWCB, UDFCD, City of Sheridan <br />