Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />6TH STREET TO 9TH STREET <br />A buried concrete slope apron would be provided at the 6th Street bridge <br />to act as a grade control structure and to locally increase the stream- <br /> <br />bed slope through the bridge constriction. <br /> <br />The proposed floodwall and berm to the north of Boulder Creek would <br /> <br />prevent the diversion of floodwaters associated with the lOO-year <br /> <br />discharge of 12,000 c.f.s. onto Canyon Boulevard. <br /> <br />The existing kid's fishing pond would be excavated and enlarged to <br /> <br />provide increased flood conveyance. The existing inlet and outlet <br /> <br />structures on the west and east ends of the kid's fishing pond would be <br /> <br />removed and replaced in conjunction with the proposed pond enlargement. <br /> <br />Access to the south bank of the kid's fishing pond and the north bank of <br /> <br />Boulder Creek would be provided in conjunction with the proposed inlet <br /> <br />and outlet works. <br /> <br />9TH STREET TO BROADWAY <br />A buried concrete apron would be provided at the 9th Street crossing to <br /> <br />act as a positive grade control structure and to locally increase the <br /> <br />stream bed slope through the bridge constriction. <br /> <br />The main channel would be enlarged and excavated to provide increased <br /> <br />flood conveyance. <br /> <br />The reach between the 9th Street bridge and the Boulder Public Library <br /> <br /> <br />would be excavated and widened to provide increased flood conveyance and <br /> <br /> <br />improved flow transitions. A retaining wall having a total length of <br /> <br />175 feet would extend east from the south abutment of the existing 9th <br /> <br />Street bridge in conjunction with the proposed excavation. The area to <br /> <br />the north of Boulder Creek between 9th Street and the Boulder Public <br /> <br />Library would be bermed to prevent the diversion of floodwaters asso- <br /> <br />ciated with the estimated lOO-year discharge of l2,000 c.f.s. <br /> <br />The Justice Center parking lot to the southeast of the intersection of <br /> <br />6th Street and Canyon Boulevard would not be modified. <br /> <br />An aesthetically pleasing, simulated rock floodwall having a maximum <br /> <br />height of four feet would be built to the immediate south of Canyon <br /> <br /> <br />Boulevard between stations l296+00 and 1292+00. The proposed floodwall <br /> <br /> <br />would tie into a proposed berm on the southwest corner of the inter- <br /> <br /> <br />section of Canyon Boulevard and 9th Street. <br /> <br />The two columns supporting the library bridge south of the main library <br /> <br />would be removed and the immediate area excavated. The remaining columns <br /> <br />and bridge superstructure would be reinforced in conjunction with the <br /> <br />removal of these columns. The area to the south of the Childrens <br /> <br />Library would be excavated to provide increased flood conveyance. <br /> <br />A retaining wall having a total length of l80 feet would be installed 35 <br /> <br />feet to the south of the Childrens Library. An existing garage to the <br /> <br />5 <br />