|
<br />TABLE V I I - 3
<br />
<br />ANNUAL OPERATION AND MAINTENANCE COSTS
<br />
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />
<br /> OVERBANK AREAS PEDESTRIAN
<br /> REACH CHANNEL LANDSCAPE REPLACE BR lOGE RE- CONOU IT TOTAL
<br /> Natural Irrigated REACH at 25, 50, and 75 PLACEMENT @ OR COST
<br /> YEARS ( $) 25, 50 & 75 POND ($)
<br /> Acres ($) Acres ($) YEARS ( 51 ($)
<br /> 12.35 Ac. 1.65 Ac 4250'
<br />CANYON MOUTH TO 6th $11,900 $3,100 $2,300 $2,300 $19,600
<br /> 6.58 Ac. 1.1 Ac. 1120 ' $5,100 1.26 Ac
<br />6th to 9th Street $ 6,400 52,100 $ 600 $200 $14,100
<br /> SUBTOTAL: $18,300 55,200 $2,900 $7,400 $200 $33,700
<br />9th TO BROADWAY NA 3.0 Ac. 1230' 700'
<br /> $5,600 $ 700 $ 7 , 600 $11,300 $700 $25,900
<br />BROADWAY TO 17th 1.4 Ac. 3.0 Ac. 2170 .
<br /> $ 1,400 $5,600 $ 1,200 $14,800 $ 9 700 1$32.700
<br />17th ST. TO 24th ST. NA 3.0 Ac. 2680 '
<br /> $5,600 $1,500 NA $38,900 $46,000
<br />24th ST. TO 28th ST. 1300'
<br />W/O CHANNELIZATION NA NA $ 700 NA $10,500 $11,200
<br />24th ST. TO 28th ST. 4.55 Ac.
<br />W/ CHANNELIZATION $ 4,400 NA $ 700 NA $10,500 $15,600
<br />28th TO 30th NA NA 1550 I
<br /> $ 800 NA $ 800
<br />20th TO 55th NA NA 10,725 '
<br /> $5,900 NA $ 5,900
<br />TOTAL W/O
<br />CHAN. 24th to 28th $19,700 $22,000 $13.700 $29,800 $70,400 $155,60c
<br /> -
<br />TOTAL WITH $24,100 $22,000 $)3,700 $29,800 $ 70 ,400 $900 $ 160. 90(
<br />CHAN. 24th to 28th
<br />
<br />62
<br />
|