Laserfiche WebLink
<br />Costs <br /> <br />Unit Costs <br /> <br />Right-of-Way Costs <br /> <br />Operation and Maintenance Costs <br /> <br />Engineering Costs <br /> <br />Legal and Administrative Costs <br /> <br />Contingency Costs <br /> <br />Benefits <br /> <br />Tangible Benefits <br /> <br />Intangible Costs <br /> <br />VIII. Recommended Plan <br /> <br />OEF1C\AL copy <br /> <br />eotOfV\DO WATER tONSERVAT10n 'B~~~ <br />823 STATE CENTENNIAL BUILDING <br />1313 SHERMAN STREET <br />DENVER, COLORADO 80203 <br /> <br />Ii <br /> <br />PAGE <br /> <br />FIGURES <br /> <br />59 <br />58 <br />61 <br />61 <br />61 <br /> <br />II-l <br /> <br />11-2 <br /> <br />111-1 <br /> <br />111-2 <br /> <br />II 1-3 <br /> <br />63 <br />63 <br />65 <br />65 <br />65 <br /> <br />IV-l <br /> <br />IV-2 <br /> <br />V-I <br /> <br />V-2 <br /> <br />V-3 <br /> <br />v-4 <br /> <br />75 <br /> <br />TABLES <br /> <br />1 - 1 <br /> <br />VI-l <br /> <br />VI-2 <br /> <br />V 11-1 <br /> <br />VII-2 <br /> <br />V 11-3 <br /> <br />V 11-4 <br /> <br />APPENDICES <br /> <br />A <br /> <br />B <br /> <br />C <br /> <br />D <br /> <br />E <br /> <br />PAGE <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Boulder Creek Basin 13 <br /> <br />Study Area 14 <br /> <br />Probability Discharge Curves 23 <br /> <br />Discharge Probability Profile 23 <br /> <br />100-Year Hydrograph 24 <br /> <br />Flood of 1894 26 <br /> <br />Flood of 1894 27 <br /> <br />Cross-Section 40 <br /> <br />Low Flow Channel Profi Ie 41 <br /> <br />3-10 c.f.s. Channel 42 <br /> <br />Plan of Typical Channel 42 <br /> <br />Summary of Previous Studies <br />Matrix of Alternatives 44 thru 47 <br />Flow Characteristics of Selected Alternative 48 thru 58 <br />Unit Prices 59 <br />Drainage and Flood Control System Maintenance 60 <br />Annual Operation and Maintenance Costs 62 <br />Benefit/Cost Display 67 thru 74 <br /> <br />Agency/Interested Party Contact A-I <br /> <br />Bibliography B-1 <br /> <br />Tabulated Flood Hazard Information C-l thru C-4 <br /> <br />Project Review Statements 0-1 thru 0-8 <br /> <br />Sediment and Debris Analysis Phases I and <br />i I (under separate cover) <br /> <br />Master Plan Drawings & Sheet Notes Dwgs. I thru 30 <br />