Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />il <br />I <br />il <br />I <br />II <br />I <br />I <br /> <br />analyze the proposed North Division Avenue Detention Pond. Improvements are proposed for the 10- <br />year stoan and are summarized as follows: <br /> <br />· Install new crossings at the BNRR, Phelps Street, in a parking lot about 1,000 feet upstream of <br />HWY 14, and at HWY 14 <br /> <br />· Channel improvements are proposed at various locations which typically involves widening the <br />channel bottom and re-garding the channel sideslopes. A realignment of a portion of the Pioneer <br />Ditch is recommended to shorten the overall length and provide a steeper grade. <br /> <br />· The Division A venue detention facility is proposed on the north side of Division A venue and <br />Filmore Street to relieve flooding of the channel downstream. A conceptual design of the proposed <br />detention pond was completed but no cost estimates were provided for any of the proposed <br />improvements, <br /> <br />21 <br />