Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />'I <br /> <br />I <br /> <br /> <br />Looking upstream near Cross <br /> <br /> <br />Section 145. Left overbank <br /> <br /> <br />was planted in corn last <br /> <br />'I <br /> <br />season. <br /> <br />1 <br /> <br />October 26, 1979 <br /> <br />I <br /> <br />fl <br />fl <br />I <br /> <br />,I <br /> <br />:1 <br /> <br />The building obstructions' in this reach make it difficult to estimate <br /> <br /> <br />n-values. At this time, it is assumed that the major building obstructions <br /> <br /> <br />will be coded into the cross section input for HEC-2. Thus, the estimated <br /> <br /> <br />n-value is for minor remaining obstructions such as fences and shrubbery. <br /> <br /> <br />Obstructions will be coded based on the average obstructed areas between cross <br /> <br /> <br />sections. <br /> <br />,I <br /> <br />:1 <br /> <br />:1 <br /> <br />:1 <br /> <br />:1 <br />I <br />:1 <br /> <br />;1 <br />I <br />:1 <br />, <br /> <br />66 <br />