My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD05767
CWCB
>
Floodplain Documents
>
Backfile
>
5001-6000
>
FLOOD05767
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:50:08 PM
Creation date
10/5/2006 1:47:20 AM
Metadata
Fields
Template:
Floodplain Documents
County
Pueblo
Community
Pueblo
Stream Name
Wild Horse Dry Creek
Basin
Arkansas
Title
LOMR - Affected Panel 085077 0005 C - Case No. 01-08-389A
Date
12/31/2001
Prepared For
Pueblo
Prepared By
FEMA
Floodplain - Doc Type
Historic FEMA Regulatory Floodplain Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Page 2 of 2 <br /> <br />I <br /> <br />IDate: December 31. 2001 lease No.: 01-08-389A <br /> <br />I <br /> <br />LOMR-FW <br /> <br />- <br /> <br />II <br />~ <br />- <br /> <br />Federal Emergency Management Agency <br />Washington, D.C. 20472 <br /> <br />LETTER OF MAP REVISION FLOODWA Y <br />DETERMINATION DOCUMENT (REMOVAL) <br />ATTACHMENT 1 (ADDITIONAL CONSIDERATIONS) <br /> <br />INADVERTENT INCLUSION IN THE FlOODWAY 1 (PORTIONS OF THE PROPERTY REMAIN IN THE FLOODWAY) <br />(This Additional Consideration applies to the preceding 1 Property.) <br />A portion of this property is located within the National Flood Insurance Program (NFIP) regulatory f100dway for the flooding <br />source indicated on the Determination Document. while the subject of this determination is not. The NFIP regulatory <br />f100dway is the area that must remain unobstructed in order to prevent unacceptable increases in base flood elevations. <br />Therefore. no construction may take place in an NFIP regulatory f100dway that may cause an increase in the base flood <br />elevation. and any future construction or substantial improvement on the property remains subject to Federal. <br />State/Commonwealth. and local regulations for floodplain management. The NFIP regulatory f100dway is provided to the <br />community as a tool to regulate floodplain development. Therefore. the NFIP regulatory f100dway modification described in <br />the Determination Document, while acceptable to the Federal Emergency Management Agency (FEMA). must also be <br />acceptable to the community and adopted by appropriate community action. as specified in Paragraph 60.3(d) of the NFIP <br />regulations. Any proposed revision to the NFIP regulatory f100dway must be submitted to FEMA by community officials. The <br />community should contact either the Regional Director (for those communities in Regions I-IV. and VI-X). or the Regional <br />Engineer (for those communities in Region V) for guidance on the data which must be submitted for a revision to the NFIP <br />regulatory f1oodway. Contact information for each regional office can be obtained by calling the FEMA Map Assistance <br />Center toll free at (877) 336-2627 (877 -FEMA MAP) or from our web site at http://www.fema.gov/aboutlregoff.htm. <br /> <br />This attachment provides additional information regarding this request. If you have any questions about this attachment, please contact the FEMA Map <br />Assistance Center toll free at (877) 336-2627 (877-FEMA MAP) or by letter addressed to the Federal Emergency Management Agency, 3601 Eisenhower <br />Avenue, Suite 600, Alexandria, VA 22304-6439. <br /> <br />'\~~. ~~ <br /> <br />Matthew B. Miller. P.E.. Chief <br />Hazards StUdy Branch <br />Federal Insurance and MlUgation Administration <br /> <br />Version 1.3.3 <br /> <br />2418012CAS12086520389 <br />
The URL can be used to link to this page
Your browser does not support the video tag.