My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD05745
CWCB
>
Floodplain Documents
>
Backfile
>
5001-6000
>
FLOOD05745
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:50:05 PM
Creation date
10/5/2006 1:44:28 AM
Metadata
Fields
Template:
Floodplain Documents
County
Crowley
Community
Ordway
Basin
Arkansas
Title
Floodplain Study
Date
6/1/1987
Prepared For
Ordway
Prepared By
Simons Li & Associates Inc.
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Table 1. <br /> <br />Table 2. <br /> <br />Table 3. <br /> <br />Table 4. <br /> <br />Table 5. <br /> <br />Table 6. <br /> <br />Table 7. <br /> <br />Table 8. <br /> <br />Table 9. <br /> <br />LIST OF TABLES <br /> <br />Summary of Proposed Land Uses, Town of Ordway <br /> <br />Summary of Rainfall Depth (in inches)/Duration Data <br /> <br />Summary of Rainfall Depth and Distribution Data <br />2-Hour Thunderstorm . . . . . . . <br /> <br />Basin Data - SCS Hydrologic Model <br /> <br />Planning Area Sub-Basin Data Stormwater Management Model <br /> <br />Summary of Peak Discharges - Offsite Basins/Future <br />Development Condition . . . . . . . . . . . <br /> <br />Summary of Peak Discharges - Future Development Conditions <br /> <br />Summary of Flood-Prone Structures <br /> <br />Cost Estimate: Full Conveyance - Historic Path, <br />Conceptual Design .,........ <br /> <br />Table lD. Cost Estimate: Di versi on Al ternative <br />Table 11. Cost Estimate: Detention Alternative <br />Table 12. Comparison of Conceptual Alternatives <br />Table 13. Cost Estimate for Selected Plan <br />Table 14. Cost Estimate - Offsite Drainageway Improvements <br />Table 15. Summary of Construction Cost By Phase . <br /> <br />ii <br /> <br />Page <br /> <br />9 <br />9 <br /> <br />11 <br /> <br />16 <br />17 <br /> <br />18 <br />19 <br /> <br />24 <br /> <br />35 <br />36 <br /> <br />37 <br />40 <br /> <br />43 <br />44 <br /> <br />48 <br />
The URL can be used to link to this page
Your browser does not support the video tag.