Laserfiche WebLink
<br />~' <br /> <br />Allowing 5% for down time and misc, losses, kwh/yr, ~ 6,190,000 kwhJyr. <br /> <br /> <br />6,190,000 x 22,9 mills/kwh, - 1979 rate - P,R.PA ~ $141,750/yr. gross revenue. <br /> <br /> <br />CITY OF LOVELAND HYDROELECTRIC PLANT <br />POWER OPERATION STUDY <br /> <br />~. <br />t~.~ <br /> <br /> NO, CFSI % % (11 NET (21 <br />MO, EPF, KW HRS, KWH <br /> UNITS UNIT Q HEAD HEAD <br />OCT, 2 24.2 96 101 88 273 922 744 686,000 <br />NOV, 2 20,8 83 107 90 290 861 720 620,000 <br />DEC, 1 23,9 96 118 88 320 121517 744 385,000 <br />JAN, 1 15,3 61 I 122 85 329 335 744 249,000 <br />FEB, 1 15,5 62 120 86 329 348 672 234,000 <br />MAR, 1 20.4 82 105 90 324 472 744 351,000 <br /> , <br /> i <br />APR, 2 22.1 88 105 90 283 893 720 i 643,000 <br /> I <br /> i <br />MAY 2 25.0 100 100 85 269 , 907 744 675,000 <br />JUNE 2 25,0 100 100 85 269 907 720 653,000 <br /> I <br />JUL Y 2 25,0 100 100 85 269 907 744 675,000 <br />AUG, I 2 25,0 100 100 I 85 I 269 , 907 744 675,000 <br /> , I <br /> , , I I <br /> I <br /> I , <br /> , <br />SEPT, 2 25,0 100 100 85 269 907 I 720 I 653,000 <br /> i r <br /> I i I <br />YEARI ! <br /> I 6,499,000 <br /> I <br /> <br />" <br /> <br />~ <br /> <br />Note: With only 1 unit operation would not be feasible below 20 cfs + considerably more <br />than 483,000 kwh, (Jan. & Feb.) would be lost, Loss of revenue - 483,000 x ,0229 ~ <br />$17,060, Capitalized at 8% ~' $138,250 equivalent capital loss, Two units can be pro, <br />vided at much less added cost. <br /> <br /> (2) <br />,,-. <br />" <br /> (1) <br /> <br />Assume customary 115% load is ok, <br />Generator Eff, taken as 93,5% av, KW ~ Q x H x ET x ,935 x ,746/8.8 ~ ,0793 <br />From Fig, 37, Mono, 20, reduced 2% because of small size .90% peak, 85% full gate. <br />C-3 <br />