Laserfiche WebLink
<br />TABLE 4-6 <br /> <br />PROGRAM DATA HIERARCHY <br /> <br />TITLE CARDS <br /> <br /> <br />Apply to every job <br /> <br />JOB CARDS <br /> <br />Type of Analysis <br />Size and Format of <br />Grid Cell Data File <br />Data Variable Location <br />Nonstructural Analysis <br /> <br />LAND USE CARDS <br /> <br />Value of Structure <br />Structure Density <br />Stage-Damage Relationships <br />Land Use Description <br /> <br /> <br />Apply to each land use <br />category analyzed <br /> <br />Reference Flood Elevation <br />Aggregation Elevation Interval <br />Single Event Elevation <br />- Modification of Land Use Damages <br /> <br /> <br />Apply to each -damage <br />reach analyzed <br /> <br />DAMAGE REACH CARDS <br /> <br />Data Card Description <br /> <br />Title Cards, TI, Tl, T3. The title cards are required and they provide <br /> <br />output display information that can readily identify the project and the <br /> <br /> <br />particular job. The content of the title cards is optional, but it is sug- <br /> <br /> <br />gested that they include a record of the project name, data notes, selected <br /> <br /> <br />program options, and any unique features of the job. A numbering system that <br /> <br /> <br />accounts for the job run for a particular project would prove useful. The <br /> <br /> <br />information on the title cards is printed, in general, at the top of each page <br /> <br /> <br />of the computer printout. <br /> <br />First Job Card, JI. This required card specifies the type of analysis <br /> <br /> <br />to be performed (flood proofing, evacuation, single event, etc.), the printout <br /> <br />4-30 <br />