My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD05661
CWCB
>
Floodplain Documents
>
Backfile
>
5001-6000
>
FLOOD05661
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:49:50 PM
Creation date
10/5/2006 1:41:48 AM
Metadata
Fields
Template:
Floodplain Documents
County
Adams
Community
Cities of Federal Heights, Thornton
Stream Name
Niver Creek
Basin
South Platte
Title
Drainage Study
Date
2/1/1974
Prepared For
Federal Heights, Thornton, Adams County
Prepared By
UDFCD
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />East 85th Avenue Crossing <br /> <br /> <br />The East 85th Avenue crossing presently consists of Q 36-inch CMP culvert. <br /> <br /> <br />The existing discharge capacity is negl igible; therefore, this culvert should be re- <br /> <br />placed with a culvert with ample capacity to poss the IOO-year flood flow. <br /> <br />Tributary l Detention - Plate 111-8 <br /> <br />Tributary l at Interstate 25 was recommended in the Phase A report as a <br /> <br />site for detention. This detention pond will significantly reduce the amount of <br /> <br />flow carried in the Niver Creek channel during flood conditions. A low dike and <br /> <br />modification of the existing culvert under 1-25 to reduce its discharge capacity <br /> <br />will be required to form the detention pond. <br /> <br />The detention facilities were studies in order to reach an optimum solution <br /> <br />between cost (both structure and land acquisition), physical limitations and net <br /> <br />effect of detention on Niver Creek flows. It was determined that the facilities <br /> <br />should be designed such that the detention pond level would reach elevation 5233 <br /> <br />under 100-year flood inflow conditions. <br /> <br />The planned detention does not meet any of the State Engineer's criteria <br /> <br />to classify it as a dam; therefore, no consideration of PMP flow was made. <br /> <br />The water level behind 1-25 will reach elevation 5230 under present chan- <br /> <br /> <br />nel conditions, without detention, during a IOO-year storm. This represents an area <br /> <br />of about 0.75 acre. With detention, the 100-year flood plain would be about 1.5 <br /> <br />acres; therefore, 0.75 acre of additional land will have to be purchased to insure <br /> <br />no future development will occur within the JOO-year flood pool. <br /> <br />Niver Creek Detention - Plate 111-9 <br /> <br />The Niver Creek main channel at East 88th Avenue was also identified as <br /> <br />a detention site in the Phose A report. The optimization study for this facility <br /> <br />showed that it should be designed for a maximum water surface level of elevation <br /> <br />111-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.