My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD05653
CWCB
>
Floodplain Documents
>
Backfile
>
5001-6000
>
FLOOD05653
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:49:49 PM
Creation date
10/5/2006 1:41:38 AM
Metadata
Fields
Template:
Floodplain Documents
County
Arapahoe
Community
Arapahoe County
Stream Name
Unnamed Creek
Basin
South Platte
Title
LOMR - Affected Panel 08005C 0195 J, 08005C 0215 J - Case No. 99-08-416P
Date
2/18/2000
Prepared For
Arapahoe County
Prepared By
FEMA
Floodplain - Doc Type
Historic FEMA Regulatory Floodplain Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />h <br />.. <br /> <br /> <br />Federal Emergency Management Agency <br />Washington, D.C. 20472 <br /> <br />CERTIFIED MAIL <br />RETURN RECEIPT REQUESTED <br /> <br />IN REPLY REFER TO: <br />Case No.: 99.08;.416P <br /> <br />The Honorable Steve Ward <br />Chairperson, Arapahoe County <br />Board of Commissioners <br />5334 South Prince Street <br />Littleton, CO 80166-0060 <br /> <br />Community: Arapahoe County, Colorado <br />Community No.: 080011 <br />Panel Affected: 08005COl95 J and 0215 J <br />Effective Date of FE B 1 8 2000 <br />This Revision: <br /> <br />102-I-C <br /> <br />Dear Mr. Ward: <br /> <br />This responds to a request that the Federal Emergency Management Agency (FEMA) revise the effective <br />Flood Insurance Rate Map (FIRM) for your community in accordance with Part 65 of the National Flood <br />'"Insurance Program (NFlF-) regulations. In a letter dated July 12, 1999, Mr. Barry O. Moore, P.E. Project <br />Manager, EMK Consultants, Inc., requested that FEMA revise the FIRM to show the effects of updated <br />topographic information and construction along Unnamed Creek of a restrictor structure on the existing box <br />culverts at East Hampden Avenue associated with construction of the Mesa Filing No. I development. The <br />Special Flood Hazard Area (SFHA), the area that would be inundated by the flood having a I-percent chance <br />of being equaled or exceeded in any given year (base flood), along this reach is designated Zone A, an SFHA <br />with no base flood elevations determined. <br /> <br />This request follows up on two Conditional Letters of Map Revision issued on February 19, 1997, and <br />June 19, 1997. <br /> <br />All data required to complete our review of this request were submitted with letters from Mr. Steven L. <br />Gardner, P.E., Program Manager, Stormwater Management Group, Development Services/Infrastructure <br />Management, Engineering Division, Arapahoe County, and Mr. Moore. <br /> <br />We have completed our review of the submitted data and the flood data shown on the effective FIRM. We <br />have revised the FIRM to modify the floodplain boundary delineations of the base flood along Unnamed <br />Creek from just downstream to approximately 3,000 feet upstream of East Hampden Avenue. As a result <br />of the modifications, the width of the SFHA increased in some areas and decreased in other areas. All <br />increases in SFHA width are contained on the developer's property and in the right-of-way of South <br />Himalaya Street. The modifications are shown on the enclosed annotated copies of FIRM <br />Panel(s) 08005COl95 J and 08005C0215 J. This Letter of Map Revision (LOMR) hereby revises the <br />above-referenced panel(s) of the effective FIRM dated August 16, 1995. <br /> <br />The modifications are effective as of the date shown above. The map panel(s) as listed above and as <br />modified by this letter will be used for all flood insurance policies and renewals issued for your community. <br /> <br />A review of the determination made by this LOMR and any requests to alter this determination should be <br />made within 30 days. Any request to alter the determination must be based on scientific or technical data. <br />
The URL can be used to link to this page
Your browser does not support the video tag.