My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD05634
CWCB
>
Floodplain Documents
>
Backfile
>
5001-6000
>
FLOOD05634
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:49:46 PM
Creation date
10/5/2006 1:41:14 AM
Metadata
Fields
Template:
Floodplain Documents
County
Boulder
Community
Lyons
Basin
South Platte
Title
Floodplain Information Report - North St. Vrain and St. Vrain Creeks
Date
6/1/1998
Prepared For
Lyons
Prepared By
BRW, Inc.
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />North St. Vrain & St. Vrain Creeks <br />Floodplain Update <br /> <br />Town of Lyons <br /> <br />channel constructions at bridges and culverts, thus creating a damming effect. This damming <br />effect may cause overbank flow, which in turn may erode bridge abutments and approaches. <br />Where debris had collected at channel constrictions, increasing flood flows may cause a mass of <br />debris to break loose, causing a wall of water and debris to surge downstream until another <br />obstruction is encountered, In some instances. debris may collect to the point where structural <br />capacity of a bridge is exceeded, causing the bridge to fail. <br /> <br />Bridge and culvert debris blockage remains consistent in this re-analysis with the 1987 FIR. <br />Bridges with center piers and multiple culvert installations have a 25% debris blockage of the <br />opening area, No blockage was assumed for bridges without piers or for single culvert <br />installations, To model the blockage, the low chord of the culvert or bridge was lowered to <br />reduce the opening area, The culvert information obtained by the U.S. army Corps of Engineers <br />for the 1987 FIR was used where appropriate, <br /> <br />As in the previous two studies, several culverts/bridges were assumed to be washed out during <br />the 100-year flood. This assumption was based on a visual inspection of the structural integrity <br />of the crossing by Boulder County, the Colorado Water Conservation Board, and the consultant <br />for the 1987 FIR. The crossings assumed to wash out are noted in Table 1, summary of <br />culvert/bridge data. <br /> <br />TABLE 1 <br />SUMMARY OF CUL VERT/BRIDGE INFORMATION <br /> <br /> Low Top of Bottom Pier Opening Side <br /> Invert Chord Road Width Width Area Slope <br />Location (MSL) (MSL) (MSL) (ft) (ft) (sq. ft.) (H:V) Blockage Notes <br />U.s, Highway 36 5253.5 5264,9 5267,4 65 4,0 822 2 25% <br />(1662+55) Assumed <br /> washed out <br />2nd Avenue 5308.5 5320.8 5323,0 113 1.2 1636 25% <br />(1729+10) <br />Footbridge Assumed <br />(1743+80) washed out <br />Highway 7 5329,0 S340,6 5342,0 60 552 <br />(1750+05) <br />U.s. Highway 36 5364.5 5372.3 5375,9 58 344 <br />(1786+30) <br />U.s. Highway 36 5387.5 5399,2 5404.7 59 690 <br />(18\1 +23) <br />Access Bridge Assumed <br />(1828+50) washed out <br /> <br />Floodplain Information Report 8 <br />K:\356001004\FLOODPLAIN INFORMATION REPORT,doc <br /> <br />June 1998 <br />
The URL can be used to link to this page
Your browser does not support the video tag.