Laserfiche WebLink
<br />( <br /> <br />I. INTkOOUI.1'ION <br /> <br />A. <br /> <br />AUTHORIZATION <br /> <br />The City of Longmonl Urb..n Slorm.....,ucl Man'4lcmcnl Master Plan (Master Plan) study wos <br />JUlhorizc<J under the (",ms of tbe Contra"! between the City of Longmont (City) and WRC <br />Engineering, lnc, (WRC). The smdy c""erro hydrologic modelling oflribulary basins and hydraulic <br />evaluation of stormwatcr management facilities in tlIe Longmont area. :>Iolice to Procccd was given <br />effective OcIOI:>c, I. 1992. The draft Hydrology Report (Reference. 2) was ,ubmilled on October <br />8. 1993. The Alternmives Evaluation Report (Rcference. 3)was submined for review On November <br />8. 1993, and the tinal hydrology report was submincdon November 30. 1993. The draft Collection <br />System M.Sler Plan was .ubmined for review on November 17, 1995. The final Collection System <br />Masler Plan was submined on Dccembcr5. 1995. <br /> <br />, <br /> <br />PURPOSE AND SCOPE <br /> <br />The purpose of this Master Plan project wa, 10 evaluate lI1e adequacy of existing 'lO,mwater <br />management fac;!itic, to accommodate e~i!ting and fmure ~lOrm ruuoff and 10 defi,lC the mo,t fea,ible <br />alternatives for needed !ystem improvemems. To achieve the project objective ,Ile study w,,, divided <br />into four phase!, hydmlogieandhyd,aulicanalysisoftribularyalC.lSJndexi,ting'y,tems, rreId <br />in"emory of e~;sl;ng .tructurcs along m.tjOl dra,nageways, development and evalualion of alternative <br />system improvements, and preparation of the final Ma.'ter Plan report including recommrndcd system <br />improvements. <br /> <br />In addition to tile Master Plansrudics. the projcctconlrnctalw incIudcdlransfcning stormwater <br />management system diagram. and rdatc<l information from .xi.ting hand-drafted drawing, on aerial <br />pllotograph! to computer-baM:d CAD formal. Also. e~is{ing HEC.2 wate, surface profile models <br />werewmpilcd. bascd on the availahle prcvious Sludies by WRC and others. and run on a personal <br />computer platform to provide 10 the City working models for the major drainageways that p.ass <br />through the study arc:!, Finall~'. a community oUlreach program was implememed to lolici{ from <br /> <br />I <br />\ <br /> <br />local rcsidenlS;uformationandconcems regarding drainagecondit;on. in the S1udyarea. <br /> <br />Separate documents were produced for each of the four project phases. The Hydrology Repor! <br />includes one repor! volume and 17 volume. of appendiees, The Hydrology Rcport volume contains <br />a description of the hydrolugic sludy. assumptions used for modelling purposes, and modclresultl; <br />summaries ofrunuffealculated for tbe various drainage sub-basin' and conveyanceclemcms; and <br />figures and drawings dCl'ieting oo!in boundaries, hydraulicoonncctivilY. basin imperviou.ness and <br />soil types, and mnoffhydrugraph.fo,seleelCddesignpoims, The 17 vol umcsofappendieeseomain <br />a full listing of Colorado Urban Hydrogr"1'h Procedure (CUllP) and Slormwatcr Manaj!cmem Model <br />(SWMM) output for all basins and systems modelled. <br /> <br />Dala ohtaincd through the drainage.trueture inventory program areeonta ined in two volume. tilled <br />DrainageStruelureInvcntory(Rcfcrencc.4). These "olumes includedata.heels and phOlographs for <br />each of llle structures identified along Ihe major drainageways through the srody arca. The <br />drainageway. invemoried include Sprirg Gulch, $1 Vrain Creek, 1.eft Hand Creek. Dry rrcck No, <br />I and the Oligarchy Ditch. <br /> <br />The Altemalive. Evalu'ti"" Report is a lingle volume {hat prelems a brief !ummal)' of runoff modcI <br />results. descriptiuns of ex is ling system, and are.1,ofinadequatesj' !temeapacities.descriptinnsof <br />alternative system impro\'ementsand cost,. and an evaluation discussion ot"each !<:lufalternative, <br /> <br />presented. Drawing. arc aI,o included to describe potential system improvements and alignmems. <br />TIle final MaSler Plan rcpon, th;! volume. iocludes a general dh;eussiunufsrudy methodologYJlld <br />prclents preliminary and conceptual designs and cost e!!Imates of Tec"Ommendcd sYltcm <br />;mpruvemems. AI!o included Arc diagTJms of basin and ,ub.basin boundaries and a !et of dr.wings <br />depicting existing drainage system' thruughout,heCit}" <br /> <br />c <br /> <br />MAPPING Al"D BACKUP INFORMATION <br /> <br />The primary mapping u,",1 r"r the "udy consiSletJ of CAD.hased aer;al mapping nown hy GEONEX <br />in April 19</2 Thil mnpping was provided to WRC hy tbe City on prinletJ copies at a scale of <br /> <br />2 <br />