My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD05519
CWCB
>
Floodplain Documents
>
Backfile
>
5001-6000
>
FLOOD05519
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:49:28 PM
Creation date
10/5/2006 1:37:14 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
Eastern Colorado/South Platte River Basin
Stream Name
South Platte River
Basin
South Platte
Title
Report on the Floods of June 1965 South Platte River Basin Colorado and Nebraska
Date
1/1/1967
Prepared For
CWCB
Floodplain - Doc Type
Flood Documentation Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />(2) Franktown-Parker watershed project - upper Cherry Creek <br />basin. Eighteen small dams constructed by the Soil Conservation Service <br />in the Franktown-Parker area of upper Cherry Creek basin reduced flood <br />flows upstream of the Cherry Creek Dam. Of three structures filled <br />during the flood, two were overtopped and sustained erosion damage, <br />but the third structure functioned satisfactorily. The remaining <br />15 structures were outside the area of high intensity rainfall and <br />received only moderate runoff. Benefits attributable to the system <br />include reduction of dsmages to county roads, land and buildings, and <br />irrigation systems. These benefits are estimated at $150,000. <br /> <br />(3) West Cherry Creek watershed project. The West Cherry <br />Creek watershed contains 16 floodwater retarding structures. The <br />project area was on the fringe of the storm rainfall, with rainfall <br />values of 1 inch and less. The Soil Conservation Service's report <br />did not attribute any flood damage prevention to this watershed project. <br /> <br />d. Non-Federal flood control improvements. <br /> <br />(1) The capacity of the improved channel of the South Platte <br />River at Denver was greatly exceeded by the flood discharge on 16 June, <br />consequently, no flood damage prevention was assigned to these improve- <br />ments. <br /> <br />(2) The privately constructed agricultural levee system on <br />the South Platte River immediately downstream of Denver was overtopped <br />and flanked by the June floods and was unable to prevent flooding from <br />the lesser floods of July and August. Consequently, no prevention of <br />flood damages was credited to these improvements. <br /> <br />V. DISASTER PREPARATION AND ACTION <br /> <br />22. ACTION BY TIlE CORPS OF ENGINEERS <br /> <br />a. Pre-flood and post-flood operations performed by the Corps of <br />Engineers were undertaken in compliance with the authority provided in <br />Public Law 99, 84th Congress. Operations under this authority included <br />pre-flood surveillance of developing stom and runoff conditions; <br />reconnaissance and surveillance of flooding, flood crest movements, <br />flood damages; cooperative activities with other Federal, State, and <br />local agencies, and certain clean-up and restoration of flood-damaged <br />public facilities. A major aspect of Corps of Engineers activities <br />involved cooperative operations with the Office of Emergency Planning <br />in compiling estimates of flood damages and cost estimates for certain <br />aspects of post-flood recovery work perfomed by local government <br />under the provisions of Public Law 875. <br /> <br />b. The Corps of Engineers Resident Engineer in Denver began <br />surveillance of the stom and flood conditions on 14 June 1965 when <br /> <br />.~ <br /> <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.