My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD05487
CWCB
>
Floodplain Documents
>
Backfile
>
5001-6000
>
FLOOD05487
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:49:22 PM
Creation date
10/5/2006 1:36:05 AM
Metadata
Fields
Template:
Floodplain Documents
County
Gunnison
Community
Crested Butte
Stream Name
Coal Creek
Basin
Gunnison
Title
Floodplain Information Report
Date
9/18/1992
Prepared For
Crested Butte
Prepared By
RBD, Inc.
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />encroachment was established by reducing the existing Coal Creek width an equal <br />distance from both top of existing bank locations using HEC-2 Encroachment <br />Method 1. Cross sections used were those obtained from a field survey by RBD <br />Inc.. The location of the cross sections are shown on the Floodplain delineation <br />sheets 4 and 5. The contour base mapping utilized on sheets 4 and 5 was <br />obtained from the Colorado Water Conservation Board and was used in the 1976 <br />Floodplain Information Report on Coal Creek by Engineering Consultants, Inc.. <br />Regrading adjacent to Coal Creek, through the Town of Crested Butte, has <br />occurred since the original report in 1976. The floodway delineation shown on <br />sheets 4 and 5 was based on the individual cross sections and not the base map <br />contours. The floodway delineation has been referred to on the exhibit sheets as <br />the Proposed Floodway only for use by the Town of Crested Butte in the possible <br />event this reach of Coal Creek is improved at one time. Included in the Technical <br />Appendix, under separate cover, are the detailed computations of these hydraulic <br />calculations. <br /> <br />The f100dway delineation and water surface elevations presented in Table 2 are <br />based on the HEC-2 computations assuming no reduction in the channel or <br />hydraulic structure conveyance capabilities, due to debris accumulation, as in the <br />floodplain delineation. <br /> <br /> TABLE 2 <br /> 100 YEAR FLOODWAY DELINEATION <br /> ----------------------------------------------------------- <br />Cross Cross Floodway Water Surface Water Surface <br />Section Section Width Elevation with Elevation with Diff. <br />Number Station (feet) Floodway out Floodway (ft.) <br /> ------------------------------------------------------------ <br />8 27+88 N/A 8866.6 8866.6 0.0 <br />9 29+ 75 33 8870.0 8869.3 0.7 <br />10 32+44 31 8874.6 8873.6 1.0 <br />11 34+ 71 29 8877.8 8877.0 0.8 <br />12 36+51 29 8881.3 8880.4 0.9 <br />13 39+23 29 8885.6 8884.7 0.9 <br />14 39+90 29 8887.2 8887.0 0.2 <br />15 40+60 N/A 8888.9 8888.3 0.6 <br />16 42+47 N/A 8890.8 8890.9 -,1 <br />17 42+55 N/A 8890.5 8890.6 -.1 <br />18 43+32 N/A 8892.1 8892.1 0.0 <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.