Laserfiche WebLink
<br />- - - - - - - - - - - - - - - - - - - <br /> Item Estimated Unit Price <br /> Number Description Quantity* (Each) Total Price <br /> 6 Levee Site Excavation, <br /> i ncl udi ng haul to point <br /> of final use, or disposal 19,900 CY <br /> (words) (words) <br /> $ $ <br /> ( fi gures) (fi gures) <br /> 7 Borrow Site Excavation and 7,700 CY <br /> Haul to Levee Site (words ) (words) <br /> $ $ <br /> (flgures) (flgures) <br /> 8 Levee Fill <br /> Zone 1 7,000 <br /> Zone 2 4,400 11,400 CY <br /> ------ (words) (words) <br /> $ $ <br /><: (fi gures) (fi gures) <br />~ <br />~ 9 Structure Backfill 20 CY <br />~ <br />I (words ) (words) <br />rrJ <br />I $ $ <br />w <br /> (fl gures) (fl gures) <br /> 10 Topsoi 1 Placement 1,100 CY <br /> (words) (words) <br /> $ $ <br /> (fl gures) (figures) <br /> 11 Riprap 4,500 CY <br /> (words) (words) <br /> $ $ <br /> (flgures) (flgures) <br /> 12 Bedding Material for Ri prap 2,100 CY <br /> (words) (words) <br /> $ $ <br /> (flgures) (flgures) <br />