Laserfiche WebLink
<br />.. -... .- ".."...,-"'"~._-- "",-~ .-- :..,,,,,,--.~. ..:.--~"''"''"' <br /> <br />II <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />;. <br />. <br />;1 <br /> <br />TABLE I-1 <br /> <br />BENEFIT/COST DATA FOR THE RECOMMENDED PLAN <br />DIRECT FLOW AREA 0054 <br /> <br /> 1 2 3 4 5 6 7 8 9 lO 11 12 l3 l4 <br />Alt. Description Des Construction Costs Total Annual Annual Total Ann.1 Residual Annual Net Total B/C <br /> Freq. Channel Street Utility Contingency R.O.W. Const. Const. 0& M Improvements Flood Benefit Annual Annual Ratio <br /> Improvement Crossings Relocation 25% Acquisition Costs Costs Costs I Damage Benefit Costs <br /> I <br /> Existing Condition 8,lOO 8,ldo 123,600 0 -8,lOO l3l,700 <br /> I <br />1 & 2 Adams County <br /> and <br />3 City of Thornton <br /> Enlarge E. 112th Ave. <br /> pond to 22 A.F., en- <br /> large Upper Medema <br /> to l6 A.F., Lower <br /> Medema to remain in <br /> existing condition, im- <br /> prove outlet works of <br /> all ponds. Improve ! <br /> downstream channel; 22,lL <br /> Reach 1 - <br /> Grasslined 2 l79,000 0 0 45,000 34,000 258,000 l8,400 3,700 6,600 29,900 <br /> Reach 2 - 4,000 <br /> Grasslined 2* 23,000 8,000 4,000 9,000 5,000 49,000 3,500 500 1,300 8,600 <br /> Reach 3 - Concrete ] <br /> lined lOO l32,000 0 0 33,000 0 l65,000 11,800 300 l2,1@0 0 27,700 <br /> Detention ponds lOO 245,000 89,000 6,000 85,000 l09,000 534,000 38,ioO 8,600 46,700 <br /> 579,000 97,000 lO,OOO l72,OOO 148,000 l,006,000 71,800 13,lOO 84,900 7,900 66,lOO -l8,800 92,800 .78 <br /> <br />4 <br /> <br />City of Thornton <br />Enlarge drainage cul- <br />vert and inlet at E. <br />112th Way cul-de-sac. <br />Construct grass- <br />lined channel from <br />Cherry Drive to E. <br />112th Ave. lO <br /> <br />l04,000 <br /> <br />6,000 <br /> <br />o <br /> <br />27,000 <br /> <br />39,000 170,000 l2,lOO 8,500 <br /> <br />I <br />I <br />I <br />20,600 <br />I <br />I <br />I <br /> <br />36,700 l2,900 -7,700 57,300 <br /> <br />.63 <br /> <br />683,000 l03,000 <br /> <br />lO,OOO <br /> <br />199,000 <br /> <br />187,000 l,l76,000 83,900 2l,600 <br /> <br />I <br />I <br /> <br />105T <br />I <br />I <br /> <br />. 44,600 79,000 -26,500 l50,100 <br /> <br />.75 <br /> <br />TOTAL PLAN BENEFIT/COST <br /> <br />*Crossing at Riverdale Road Designed for lO-Year Event. <br /> <br />1-5 <br /> <br />