Laserfiche WebLink
<br />The hydrologic analysis for Bear Creek was performed by the COE, <br />Omaha District (Reference 2). ~he Bear Creek Dam and Reservoir <br />intercepts flows from 239 square miles of the total 261 square <br />mile drainage basin. The remai~ing square mile drainage area <br />below Bear Creek Dam still has the potential of generating damaging <br />runoff flows during a cloudburst event over the lower basin. <br />No applicable runoff records are available through this reach <br />because of the recent construction of the dam. Therefore, discharges <br />for the 22 square mile drainage' area below the dam were developed <br />by using the U.S. Environmentall Protection Agency Storm Water <br />Management Model (Reference 4) with modifications by the Missouri <br />River Division of the COE. The$e discharges were computed assuming <br />full basin development. ' , <br /> <br />Peak discharge-drainage area relationships for Bear Creek are <br />shown in Table 1. <br /> <br />3.2 Hydraulic Analyses <br /> <br />Analyses of the hydraulic charapteristics of flooding from the <br />sources studied were carried out to provide estimates of the eleva- <br />tions of floods of the selected! recurrence intervals. <br /> <br />Water-surface elevation~ of flopds,of the selected recurrence <br />intervals were computed through: the use of the COE HEC-2 step- <br />backwater computer program (Reference 5). <br /> <br />CrolOs section data, Manning's Or" values, and starting water-surface <br />elevations were developed for use in the 1979 Urban Drainage and <br />Flood Control District Flood Area Delineation report for Bear <br />Creek (Reference 6). Cross section data were obtained photogram- <br />metrically by digitizing cross 'sections marked on aerial photographs <br />of the stream channel and flood' plain (Reference 7). The digitized <br />, , , <br />cross section data were supplemented with cross sections taken <br />from topographic mapping (Reference 8) developed from the aerial <br />photography. All bridge cross ~ections were obtained from actual <br />field measurements. Roughnessboefficients for the channel and <br />overbank areas were elOtimated b,Y field inspection of the study <br />area. Manning's On" values wer~ 0.035 in the channel and from <br />0.025 to 0.090 in the overbank areas. <br /> <br />, I <br />Additional cross sections were ,included from channel improvement <br />plans due to recent grading and channel improvements in the vicinity <br />of South Lowell Boulevard. <br /> <br />Shallow flooding along the soutp bank of Bear Creek is the result <br />of side spill from the main cha~nel. This side spill occurs from <br />the east edge of, South Fede,ral ~oulevard downstream to South Clay <br />Street. Approximately 2,000 q~s of the 100-year discharge of <br />8,150 cfs spills into this sha1low flow area and attains a water- <br />surface elevation below that o~ the main channel. These flows <br /> <br />6 <br />