My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD05367
CWCB
>
Floodplain Documents
>
Backfile
>
5001-6000
>
FLOOD05367
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:49:02 PM
Creation date
10/5/2006 1:29:02 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Basin
Statewide
Title
Design and Construction of Levees
Date
3/8/1999
Prepared For
CWCB
Prepared By
US Army Corps of Engineers
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Table 1 <br />General Procedure for Levee Design <br /> <br />Step Design Task <br />I Obtain detailed topographic information for the area of interest. A contour interval of 2 <br /> feet is preferred, <br />2 Collect geological data for subsurface soils along the proposed levee alignment and <br /> potential borrow material areas, <br />3 Perform geoteehnical testing and analyses to determine foundation soil parameters, soil <br /> profiles, and strengths of foundation materials, <br />4 Perform geoteehnieal testing and analyses to determine soil parameters for suitable <br /> borrow areas and embankment seetions, <br />5 Estimate embankment quantities for the project, and define borrow areas for the <br /> embankment material. <br />6 Divide the levee system into reaches of similar foundation conditions, and perform the <br /> following analyses for each reach: underseepage, through seepage, slope stability, and <br /> settlement. <br />7 Design embankments and special treatments as needed to mitigate any problems found <br /> in step 5, <br />8 Compute final quantities needed for the projeet, and determine final borrow area <br /> loeations, <br />9 Design embankment slope protection as needed, <br />10 Create final construction drawings, specifications, and an inspection and maintenanee <br /> manual. <br /> <br />Technical Criteria: Specifie criteria regarding levee geometry are presented in Table 2, <br />CWCB staff may oceasionally approve variances providing that sufficient teehnical baekup data <br />is submitted to justify the requested deviation from the reeommended eriteria. See attaehed <br />figure 1 for a typical levee cross-section, <br /> <br />Item Criteria <br />Top width Ten (10) feet <br />Side Slopes 3Hto IV <br />Freeboard Three (3) feet above the design water surface profile, The design water <br /> surface profile is based on hydraulie determinations for the selected flood <br /> frequeney (i,e, lO-year, 25-year, 50-year, or lOa-year flood event), <br /> <br />Table 2 <br />Recommended Levee Criteria <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.