My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD05300
CWCB
>
Floodplain Documents
>
Backfile
>
5001-6000
>
FLOOD05300
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:48:51 PM
Creation date
10/5/2006 1:25:44 AM
Metadata
Fields
Template:
Floodplain Documents
County
Alamosa
Community
Alamosa County
Stream Name
Rio Grande River
Basin
Rio Grande
Title
Contract documents for Rio Grande Levee Improvements, Phase I
Date
7/1/1986
Prepared For
Alamosa County
Prepared By
Muller Engineering Company, Inc.
Floodplain - Doc Type
Project
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />~ <br /> <br />-- <br /> <br />" <br /> <br />" <br /> <br />SAMPLE <br /> <br />EXHIBIT VIII-G <br /> <br />CONTRACT <br /> <br />THIS AGREEMENT, made this day of <br />between (Corporate Name of Local Public Agenc;r <br />acting herein through its (Title of Authorized Offlci8.1) <br />partnership/an individual doing business as <br />Terms), of . County of . <br />of hereinafter called "Contractor." <br /> <br />. 19.-0 by and <br />. herein called "CNner." <br />. and a corporation/a <br />(Strike Out Inapplicable <br />. and State <br /> <br />WITNESSETH: That for and in .consideration of the payments and agreements <br />hereinafter mentioned, to be made and performed by the OWNER, the CONTRACTOR <br />hereb~ agrees with the OWNER to commence and complete the construction described as <br />follows: <br /> <br />hereinafter called the project, for the sum o! Dollars <br />($ ) and all extra work in connection therewith, under the terms as stated in the <br />General and Supplemental Conditions of the Contract; and at his (its or their) own proper <br />cost and expense to furnish all materials, supplies, machinery, equipment, tools, <br />superintendence, labor, insurance and other accessories and services necessary to <br />complete the said project in accordance with the conditions and prices stated in the <br />Proposal, the General Conditions, and Supplemental General Conditions of the Contract, <br />the plans which include all maps, plats, blue prints, and other drawings and printed or <br />written explanatory matter thereof, the specifications and contract documents therefor <br />as prepared by . herein entitled the Architect/Engineer. <br />and as enumerated in Paragraph 1 of the Supplemental General Conditions, all of which <br />are made a part hareo! and collectively evidence and constitute the Contract. <br /> <br />The Contractor hereby agre<i!S to commence work under this contract on or before a <br />date to be specified in a written "Notice to Proceed" of the Owner and to fully complete <br />the project within consecutive calendar days thereafter. The Contl'actor furthel' <br />agrees to pay, as liquidated damages, the sum of $ for each consecutive <br />calendar day thereafter as hereinafter provided in Paragraph 19 of the General <br />Conditions. <br /> <br />The OWNER agrees to pay the CONTRACTOR in current funds for the performance <br />of the contract, subject to additions and deductions, as provided in the General . <br />Conditions of the Contract, and to make payments on account thereof as provided in <br />Paragraph 25, "Payments to Contractor," of the General Conditions. <br /> <br />VIII-G-l <br />
The URL can be used to link to this page
Your browser does not support the video tag.