Laserfiche WebLink
<br /> Item Estimated Unit Price <br /> Number Description Quantity* (Each) Total Price <br /> 7 Topsoil Stripping <br /> Levee Site 2,700 <br /> Borrow Si te 1,900 4,600 CY <br /> (words) (words) <br /> $ $ <br /> ( fi gures) ( fi gures) <br /> 8 Levee Site Excavation 14,000 CY <br /> (words) (words) <br /> $ $ <br /> (figures) (figures) <br /> 9 Borrow Site Excavation and 11 ,600 CY <br /> Haul to Levee Site (wOrdS) (words) <br /> $ $ <br /> (fi gures) (fi gures) <br />< 10 Levee Site Excavation, Haul to <br />- <br />- Borrow Site, Place and <br />- <br />I Compact 9,200 CY <br />r~ <br />I ( words) ( words) <br />w <br /> $ $ <br /> ( fi gures) ( fi gures) <br /> 11 Levee Fi 11 <br /> Zone 1 14,800 <br /> Zone 2 10,300 25,100 CY <br /> ------ ( words) (words) <br /> $ $ <br /> ( fi gures) ( flgures) <br /> 12 Structure Backfill 250 CY <br /> (words) (words) <br /> $ $ <br /> ( fi gures) ( fi gures) <br /> 13 Topsoil Placement <br /> Levee Site 1,600 <br /> Borrow Site 1,900 3,500 CY <br /> (words) (words) <br /> $ $ <br /> ( fi gures) ( fi gures) <br /> II r-. r-I r-I -I 1- - r- i ! . - - - - - - -, <br />