Laserfiche WebLink
<br />CHArTER IV <br />EST~_l1!'~['f:r~~C)ST~ <br /> <br />General <br /> <br />Estimated costs for construct-ion of tile proposed drainage improve- <br /> <br />ments are presented in this chapter. TttP f~s1_imates of construction cost <br /> <br /> <br />are based on the implementation of the proposed drainage improvement~s <br /> <br />presented in Drawings 11 through 32. Allernati,'c schemes or materials <br /> <br /> <br />may be proposed during final design w~lich wOlllel change the costs pre- <br /> <br /> <br />sented herein. However, these costs 1~111 provide a guide for planJling <br /> <br />the implementation of the proposed dr~:,in'lgf'way improvements in Fir:~t <br /> <br />Creekc <br /> <br />The cost estimates are based on Fet)[uary, j 975, construction costs <br /> <br />for similar projects. Costs wil'L increase considerably in the future <br /> <br /> <br />~hen the project is construc~ed if the C~lrrent economic trends continue. <br /> <br />The cost of engineering, legcll fces, and 3_dministrative costs which <br /> <br />wil] be required during the :implenlcntati_dn of this project have been <br /> <br />f'stil1ated as a percentage of the t.ot-a:: construct_ion cost. Approximately <br /> <br /> <br />8% of the field cost has been used for :]l:i_S. <br /> <br />The all_oeation of constructi_on C()S~:i 3mong the District and l.()cal <br /> <br /> <br />governments within the drainage ba::::in call he accomplished in many ways. <br /> <br />Each entity could pay for the cOIlstrU("ti()n wtich takes place within its <br /> <br /> <br />bounjaries, each entity could COIltribllte b.~Sf'd on the percentage of <br /> <br /> <br />drai:1age basin area it OccupJ~es, etc. \.,Ihclever method is finally adopt- <br /> <br /> <br />ed, 111 entities within the basin must agn"f' to j t. To date, there has <br /> <br /> <br />been no agreement on a method of allac.)!:.: Oil cf r:onstruction costs; <br /> <br /> <br />therl:-fore, any allocation made in th-is [(~p()rt l~ould be of little value, <br /> <br /> <br />and has not been included. <br /> <br />Right-of.'way required for st(uctur('~; is lo(~ated almost complet.ely <br /> <br /> <br />within the flood plainc The price of the. flood plain property will be <br /> <br />h:ighLy infJuenced by the fact that it may l)~ zoned as flood plain. In <br /> <br /> <br />many cases local governments and deve]oIwIs '.....'i l:i_ work out~ Lrades whereby <br /> <br />IV-] <br />