Laserfiche WebLink
<br />l[ r n' :)L','", <br /> <br />11'. -- C-\( <br /> <br />,~ <br /> <br />r,t.; <br /> <br />1-'--.~~~r"""K: <br />=:liC:;~ ~ Gii <br />J: ~1I ~~[{\m;;)) Jr] ENGINEE:E'~I:I,,"Gc <br />_II'--.~ ~~.cm'" <br />I'-"'-='=OJ ~ """ <br />,-...---- - ..... <br /> <br />CO:NS1J'LTAN':C'S, <br /> <br />:r:N'Cc <br /> <br />Mar.ch 31, 1977 <br /> <br />Mrc L. Scott Tucker <br />Executive Director <br />Urban Drainage and Flood Control District <br />2480 West Twenty-Sixth Avenue, Suite :.56-1': <br />Denver, Colorado 80211 <br /> <br />OUI Fi:.: 1140/1 <br />DG 498/77 <br /> <br />SIJbject <br /> <br />First Creek Major <br />Drainageway Planning- <br />Phase B <br /> <br />Dear Mr. Tucker: <br /> <br />We are pleased to present the Phase I': of the First Creek Drainage <br />Study. This report was prepared for the District under the tenDS of <br />our contract dated September 2/" 1973 c Th. report is presented in t\<o <br />volumes; Volume I containing the sunnnary ""port and Volume II cont-ain- <br />ing the Master Plan drawings reduced to 11" x 18". Phase B report is <br />complementary to the Phase A report ",hieb. ,.;as transmitted to you on <br />July 12, 1974 c <br /> <br />The purposes of this report are as fol1ow~j: <br /> <br />L Conduct final hydrology and hydraulic studies for the recom- <br />mended plan. <br /> <br />2c <br />ments <br />Urban <br />1976. <br /> <br />Prepare layouts and preliminary designs for drainage improve- <br />recommended in Plan A of the Phase 11 report, as modified per <br />Drainage and Flood Control Dj.strict letter of December 10, <br /> <br />3. <br /> <br />Prepare master plan drawingE, of t.he preliminary designs_ <br /> <br />4. <br /> <br />Prepare cost estimates associa tee: VIi tn these improvements. <br /> <br />It'd r()l!'.&:t <br /> <br />Tabulation of maximum flows at strategic clesign points within First. <br />Creek drainage basin were present,eel 11\ the Phas.e A report. These maxi- <br />mum flows were prepared for both the pxisting a.nd future development <br />conditions. In this report we have presented t.he hydrographs :for 1~he <br />future laO-year flood at design point.. <br /> <br />~\ "~;\rdj!\:; IFSC1'flC!-J ';( p,-~. 'I' .~, <br />