Laserfiche WebLink
<br />i <br /> <br />4 <br /> <br />This determination has been made pursuant to Section 206 of the Flood Disaster Protection Act of 1973 <br />(Public Law 93-234) and is in accordance with the National Flood Insurance Act of 1968, as amended <br />(Title XlII of the Housing and Urban Development Act of 1968, Public Law 90-448), 42 U,S.C. 4001- <br />4128, and 44 CFR Part 65. Pursuant to Section 1361 of the National Flood Insurance Act of 1968, as <br />amended, communities participating"in the NFIP are required to adopt and enforce floodplain management <br />regulations that meet or exceed minimum NFIP criteria, These criteria are the minimum and do not <br />supersede any State or local requirements of a more stringent nature, This includes adoption of the <br />effective FIRM and FBFM to which the regulations apply and the modifications described in this LOMR, <br />Our records show that your community has met this requirement. <br /> <br />A Consultation Coordination Officer (CCO) has been designated to assist your community, The CCO <br />will be the primary liaison between your community and FEMA, For information regarding your CCO, <br />please contact: <br /> <br />Mr. Steve L, Olsen <br />Director, Mitigation Division <br />Federal Emergency Management Agency, Region VIII <br />Denver Federal Center, Building 7 10, Box 25267 <br />Denver, Colorado 80225-0267 <br />(303) 235-4830 <br /> <br />If you have any questions regarding floodplain management regulations for your community or the NFIP <br />in general, please contact the CCO for your community at the telephone number cited above. If you have <br />any technical questions regarding this LOMR, please contact Mr. John Magnotti of our staff in <br />Washington, DC, either by telephone at (202) 646-3932 or by facsimile at (202) 646-4596. <br /> <br />Sincerely, <br />--? <br /> <br /> <br />Enclosures <br /> <br />cc: <br /> <br />Mr. Tim Moore <br />City Engineer <br />City of Rifle <br /> <br />Mr. Mark L. Bean <br />Director <br />Building & Planning Department <br />Garfield County <br /> <br />Mr. L. Scott Tucker <br />Executive Director <br />Urban Drainage and Flood <br />Control District <br /> <br />Ms. Leslie A. Hope, E.I. <br />Project Engineer <br />High Country Engineering, Inc. <br />