Laserfiche WebLink
<br />BIBLI(X;RAPHY <br /> <br />1. Colorado Water Conservation Board, conversation of Bill Mullen <br />~ith Charles Steele, Mineral County Land Use Administrator, <br />July 23, 1986, <br /> <br />RECOXMINDATIONS <br /> <br />2. Colorado\olaterConservationIk>ard, field survey of Jul)O 22 and <br />23,1986. <br /> <br />3. Creed.., Candle (ne~spaper). October 7,1911, <br /> <br />Because it has been determined by the Colorado Water Conservation <br />Board that the lOO-year floodplain in the To~n of Creede is confined to <br />the Corps of Engineers flood control channel, it is recommended that the <br />To~n appeal to the Federal Insurance Administration ~ith the findings of <br />this report. It would appear tllat tile mandatory requirements of the <br />To~'s participation in the National Flood Insurance Program (NFIP) may <br />not be neededl ho~ever, the community should remain in the NFI? so that <br />flood insurance is available to residents ~ho may desire to purchase <br />flood insurance. <br /> <br />4. Pavis Engineering Ser"lce, Inc., Pel None, Colorado, Map of <br />~.!!.!.Creede,1971. <br />5. Pel Norte Prospector (newspaper), May 16, 1941. Also May 21, <br />T<i48,May28,1948,andJune24,1949. <br /> <br />6, Federal Insurance Administration, Flood Hazard Boundary ~ <br />Tmm 2! Creede, revised January 16, 1976, Community No. 080118A <br /> <br />7. San~Prospecto~ (newspape~), July 1, 1927. <br /> <br />A yearly llI3intenance schedule simila~ to the One currently pursued <br />by the Town is recommended in order to keep clea~ debris upstream f~OIll <br />the entrance to the Corps of En8inee~s flood control channel. This is <br />essential in order for all flood flo~s to ente~ the Corps channel and not <br />be diverted around the channel. <br /> <br />80 U,S, A~my Corps of Engineers, Analysis ~ Desi~n on Wi1lo~ <br />Creek Channel Improvement, Creede, Colorado, May, 1949. <br /> <br />9. U. S. Army Corps of Enginee~s: HEC-2 \oIater Surface Profiles, <br />Computer ProRram, The Hydrologic Engineering Center, Davis, <br />California <br /> <br />10. ~.S. Army Corps of Englnee~s, Statistical ~ethods ~ Hydrolo~v, <br />January, 1962. <br /> <br />11. U.S. Army Corps of Engineers, Supplemental Analysis .2! Desi~n <br />on Willow Creek Channel I~provement, Creede, Colo~ado, <br />"September, 1949. <br /> <br />12. U.S. Army Corps of Engineers, Willo~ Creek Channel Improvement <br />P~oiect Drawin~s, September, 1949 (8 sheets), also ~y, 1949 <br />(21 sheets) <br /> <br />13. ~.S. Coast and GeodetiC Survey, Vertical Control~, October <br />18,19431re"isedAugust18,1953 <br />140 U.S. Geological Sur"ey, Compilation of Surface Water <br />Records, and Water Resource Data tor Colorado (applicable yea~s) <br /> <br />15. U.S. Geological Survey, RatlnR Tables!2!. GaRe ",,'illo~ Creek at <br />Creede",ninetables. <br /> <br />16. U.S. Geological Survey, strip chsrts for gage "Willow C~eek o.t <br />r.rpp",,". <br /> <br />17.U.S.GeologicelSurvey,lS'map:Creede,Colorado, 1959 <br /> <br />18. U.S. Senate, Docurncnt1:!2.:..~. 78thCong~ess, 1st Session, 191,3. <br /> <br />" <br /> <br />" <br />