My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD05215
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD05215
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2010 10:11:56 AM
Creation date
10/5/2006 1:21:17 AM
Metadata
Fields
Template:
Floodplain Documents
County
Douglas
Arapahoe
Community
Greenwood Village, Aurora
Stream Name
Cherry Creek
Basin
South Platte
Title
Probable Maximum Precipitation Study for Cherry Creek Reservoir - Facts
Date
1/1/1997
Prepared For
CWCB
Prepared By
CWCB
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Cherry Creek Resermir <br />Site-Specifie "robahle Maximum "recipitatiol1 Study <br />CWClI Fact Sheet <br /> <br />.",.".".'" <br />, . <br />~ . >:J.. <br />. . - <br />. . <br />';. .. f <br />'t ~ <br />. .. . <br />. , <br />. j ~) J . <br /> <br /> <br />lJ:tckground: the Flood Control Act of 1941 and 1944 <br />authorized The Cherry Creek Lake project. Construction <br />was completed in 1950 and it operated as a dry dam until <br />a pennanent pool was established in 1958. An existing <br />spillway hydraulically connects the C~crry Creek basin <br />with the adjacent Toll Gate and Sand(geek hasins. The <br />Project controls 386 square miles of the 410 square mile <br />Cherry Creek Basin. The design storm for Cherry Creek <br />Reservoir was the May 30-31, 1935 storm and the dam is <br />designctl to pass this storm with a safety factor. The <br />emergency spillway could convey llood nows cast to <br />Tollgate Creek which is a Sand Creek tributary. <br /> <br />COLORADO <br />=---., <br />~I <br />:p'a <br />lJfJ'AA)'MLVf Of <br />NATURAL <br />RESOUU.cES <br /> <br /> <br />:.=t_ <br /> <br />Cherry Creek 1>;'"1 and Resen'oir Profile: Cherry <br />Creek Drainage basin is approximately 386 square miles. The average basin length is 57 miles and average <br />basin width is II milc.."S. The average annual rainfall is 16.6 inches, the maximum elevation is 7.580 feet msl. <br />The reservoir outlet invcrt is at 5,504 feet ms!. The major tributaries are East Cherry Creek, West Cherry <br />Creek, Antelope Creek, Willow Creek. and Happy <br />Canyon Creek. The years of recorded mayor floods are <br />1864, 1875, 1976,1878, 1885, 1912, 1933 (Castlewood <br />dam failure), 1935, 1945, 1946, 1965. <br /> <br />Chern Crel'k U;tlt1 Profile <br /> <br />fUluTII' <br /> <br />[Il1'ullon <br />r<<l nlll"o M'.IIl'~1I'1 <br />''''' <br />"'" <br />5608.7 <br />"'" <br />""" <br />5646.5 <br /> <br />('.pully <br />AUlI'rll'lI'l <br />- <br /> <br />B;I.l;CorOllm <br />~ orCOllSCl1l.lionPool <br />S ll!l"a Crest <br />T orc \)'A-1\er5hi <br />T orOllm <br />Pro'ecll:d orPMfPool <br /> <br />13,220 <br /> <br />IIOJIO <br />142,230 <br /> <br />~1.5TOIlorUS.\n; <br />5M-t.5 -r - ~ P:\IFI'""I <br />,.,.#.~ 1<(:_01:::\":'<<)")"7<1&'+ <br />~18.1 . - -.----~_.~...--).~l 7 ~~..-.- <br />SpiU",.,CrN .(____~_..L/__,L_~ _\_.,.....I.r....~"""'(. <br />S5~.O . ~'/~~,u. <br />TopCon~ . 1/1 <br />PnoJeRn::1 ClIfRK..'CKU\\I, Pool , <br />PROf-II..: <br />550U)- <br /> <br />//r( <br />{(",it <br /> <br />The Corps Study: The Army Corps of Engincers . ~ _ _.....:; / <br />(USACE) - Omaha District started a study that ,,;'~Al)~ n~Hood- <br />concluded iH ...ill:t .-\ Pr:ob:.lhl.' \f'l'''imull, P.recipitation evcnt and the resulting Probable Maximum Flood <br />event could potentially overtop the dam and put 100,000 people at risk and could cause $10.15 billion in <br />damages. The PMP study also concluded that the current project could safely control 75% of the PMF under <br />existing conditions with adequate freeboard. A 1993 Dam Safety Assurance Evaluation report produced <br />some alternatives th;lt illl..'lud~'''' that have been evaluated and further studied to includc: roller compacted <br />concrete hanlening of the dam, a I >-foot dam raise, 300-400 foot new spillway on Cherry Creek Dam with a <br />9-foot dam raisc, dry dam at Castlewood Dam Site with no dam raise, dry dam at West Cherry Creek with a <br />7.5 foot ~anl raise, and a dr~ da~l at Scott Road with a 12 foot dam raise. <br />~ Sf.t.Io: T,,~/~ <br />Colorado Sf:!te Genenll Assembly Resolution 99-023: In response to the controversial recommend(ui01'S <br />and public meetings rhe local gOl'ernmelUs worked wirh the Colorado General Assembly to create Resollllion <br />99-01.~Ex(erprsfrom the Senate Resollllion 99-013 ;[/ustrare the e\'ell/S that led to eW'CR inl'O/l'emelll: <br />"WIIEREAS, the u.s. Army Corps of Engineers Jws assllmed the Cherry Creek Dam '....illfailfollowing an <br />extraordinarily improbable chain of events, ...am! WIIEREAS. this error isfllrther compoum!e(! by the <br />erro"eolls assumptiOlJ rhat the topographic effects of the Palmer Dil'ide w;[/ i"crease the rainfall i"the <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.