Laserfiche WebLink
<br />--- <br /> <br /> FEDERAL EMERGENCY MANAGEMENT AGENCY I O.M.B. Burden No. 3067-0148 <br /> CHANNELIZATION Exoires-Aoril 30, 2001 <br />I PUBLIC BURDEN DISCLOSURE NOTICE <br />Public reporting burden for this form is estimated to average 1.75 hours per response. The burden estimate includes <br />I the time for reviewing instructions, searching existing data sources, gathering and maintaining the needed data, and <br />completing and reviewing the form. Send comments regarding the accuracy of the burden estimate and any <br />suggestions for reducing this burden to: Information Collections Management, Federal Emergency Management <br /> Agency, 500 C Street, S,W., Washington, DC 20472; and to the Office of Management and Budget. Paperwork <br />I Reduction Proiect (3067-0148), Washinaton, DC 20503, <br />You are not required to respOnd 10 Ihis collection of informalion unless a valid OMS Control Number Is dlsplayotd In lhe upper righl <br />corner ofthis form. <br />I Community Name: Jefferson County <br /> Flooding Source: Weaver Creek <br />I Project Name/Identifier: Preserve at Weaver Creek <br /> 1. REACH TO BE REVISED <br />I Describe the limits of the revision OR submit a copy of the FIRM with the revision area clearly highlighted. <br /> Copy of FIRM(s) attached depicting area of the revision (highlighted, or circled)? 181 Yes <br />I Downstream Limit: Station 2430 <br /> Upstream Limit: Station 4295 <br />I 2. CHANNEL DESCRIPTION <br />I Attach the foll~wing Informallon about the channel (check box If information has been provided): <br />IZI Description of the inlet and outlet <br /> IZI Description of the shape of the channel (both cross sectiona/and p/animetrlc configuration) and its lining (channel bottom <br />I and sides): <br /> 3. ACCESSORY STRUCTURES <br />-I The channelization includes: <br /> Levees (Attach Levee/Floodwall Syslem Analysis Form - Form 8) <br />I Drop structures <br />Superelevated sections <br />Transitions in cross sectional geometry <br /> Debris basin/detention basin <br />I Energy dissipater <br />Other (Describe): <br />I 4. DRAWING CHECKLIST <br />Attach the plans of the channelization certified by a registered professional engineer. The plan detail and Information <br /> should include (check box If Information has been provided): <br />I o Channel alignment and locations of inlet, outlet, and accessory structures <br />o Channel lining <br />I o Typical cross sections and profiles of channel banks and invert <br />I ' PLEASE REFER TO THE INSTRUCTIONS FOR THE APPROPRIATE MAILING ADDRESS ~ <br /> FEMA Form 81-89E Channeliza~on Form MT-2 Form 6 Page 1 of 2 <br />I <br />