Laserfiche WebLink
<br />II <br /> <br />I <br /> <br />1 <br />I <br />1 <br />1 <br />I <br /> <br />FEDERAL EMERGENCY MANAGEMENT AGENCY <br />RIVERINE I COASTAL MAPPING <br />PUBLIC BURDEN DISCLOSURE NOTICE <br />Public reporting burden for this form is estimated to average 1.5 hours per response. The burden estimate includes the <br />time for reviewing instructions, searching existing data sources, gathering and maintaining the needed data, and <br />completing and reviewing the form. Send comments regarding the accuracy of the burden estimate and any suggestions <br />for reducing this burden to: Information Collections Management, Federal Emergency Management Agency, 500 C Street, <br />SW., Washington DC 20472; and to the Office of Management and Budget, Paperwork Reduction Project (3067-0148), <br />Wash in ton, DC 20503, <br />You are not required to respond to this collection of information unl.... a valid OMB Control Number Is displayed In the upper right CDm<< of <br />this 10nn. <br /> <br />O,M.B No. 3067-0148 <br />Expires April 30, 2001 <br /> <br />Note: Fill out one form for (JBch noodin source studied <br /> <br />Community Name: Jefferson Countv <br /> <br />Flooding Source: Weaver Creek <br /> <br />Project Name/Identifier: Preserve at Weaver Crek <br /> <br />1 This is a ~ Manual 0 Digital submission, Digita/ map submissions may be used to update digital FIRMs (DF/RMs). For <br />u datin DF/RMs, these submissions must be coordinated with FEMA Head uarters as far in advance as ossible. <br /> <br />1. MAPPING CHANGES <br /> <br />11. A topographic workmap must be submitted showing the following information (check N/A when not applicable): <br /> <br />a, Revised approximate 100-yearfloodplain boundaries (Zone A).......""..........".....".................................~ Yes <br />b. Revised detailed 100- and 500-yearfloodplain boundaries, ......"...........................................................~ Yes <br /> <br />1 ~: ~~;~~i~~ :~~d:,~:n~~n~d~ri~~~,~;~.~~~ii~~;..;;iih.;i;ii~.~.i~9.~~i~i.i~di;;i~d:.::::::::::::::::::::::::::::::::::::::: ~ ~:: <br /> <br />e. Stream alignments, road alignments and dam alignments. ................................"...................................~ Yes <br />f. Current community boundaries, ..........................................."....,.............................................,....",....... ~ Yes <br />g, Effective 100- year floodplain and floodway boundaries from FIRMlFBFM reduced or <br />enlarged to the scale ofthe topographic wOrkmap..............................."........................"........................t81 Yes <br />h. Tie-ins between the effective and revised 100-, 500-year and floodway boundaries ............................... ~ Yes <br />i. The requester's property bOundaries and community easements......""..................................................~ Yes <br />The signed certification of a registered professional engineer .................................................................~ Yes <br />Location and description of reference marks.................................................."........................................t81 Yes <br />I. Vertical datum (example: NGVD, NAVD) ............."".........."......"......................................................."... ~ Yes <br />m. Coastai zone designations tie into adjacent areas not being revised...........""......"................................ 0 Yes <br />n. Location and alignment of all coastal transects used to revise the coastal analyze.................................O Yes <br />o. V-zone has been delineated to extend landward to the heel of the primary frontal dune................."......O Yes <br /> <br />I 1 <br /> <br /> <br />If any it.ms are mark.d No or N/A please attach an explanation. <br /> <br />ONo <br />DNo <br />ONo <br />DNo <br />DNo <br />ONo <br /> <br />DNo <br />DNo <br />ONo <br />DNo <br />ONo <br />ONo <br />ONo <br />ONo <br />ONo <br /> <br />ON/A <br />DN/A <br />~N/A <br />ON/A <br />ON/A <br />DN/A <br />ON/A <br />ON/A <br />ON/A <br />ON/A <br />ON/A <br />DN/A <br />~N/A <br />~N/A <br />t8I N/A <br /> <br />2. What is the source and date of the updated topographic information (example: orthophoto maps, July 1985; filed survey, May 1979, <br />beach profile, June 1987 etc,)? Field Survev. December 1998 <br /> <br />3. What is the scale and contour interval of the following workmaps? <br /> <br />Scale <br /> <br />Contour Interval <br /> <br />Revision Request <br /> <br />Scale 1" = 100' Contour Interval 1.!! <br /> <br />NO TE: Revised topographic information must be of equal or greater detail than effective, <br /> <br />4. Attach an annotated FIRMlFBFM at the scale of the effective FIRMlFBFM showing the revised 100- and 500-year floodplain and the <br />floodway boundaries and how they tie into those shown on the effective FIRMlFBFM downstream and upstream of the revisions or <br />ad'acentto the area of revision for coastal studies. FIRM/FBFM attached? 181 Yes 0 No <br />PLEASE REFER TO THE INSTRUCTIONS FOR THE APPROPRIATE MAILING ADDRESS <br /> <br />FEMA Form 81-89D <br /> <br />Riverine / Coastal Mapping Form <br /> <br />MT -2 Form 5 Page 1 of 2 <br /> <br />1 <br /> <br />1 <br />