Laserfiche WebLink
<br />I <br />I <br /> <br />2. Profile Checklist (check box If Information has been provided on profile) <br /> <br />I <br />I <br /> <br />-. <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br /> <br /> <br />I <br /> <br />Explain how they were determined. <br /> <br />3. STARTING WATER-SURFACE ELEVATIONS <br />Explanation Attached? <br /> <br />No <br /> <br /> <br />NOTE: If the effective study is an approximate study, the slope/area method is recommended. <br />For detailed anal sis studies, usin a known water-surface elevation is recommended. <br /> <br />4. RESULTS from the model used to revise the 100- ear water surface elevations <br /> <br />If the results indicate any of the following, attach an explanation - to this form, or to the hydraulic model printout- as to the <br />reasonableness of the situation, <br /> <br />o Supercritical depth <br /> <br />IZI Critical Depth <br /> <br />o Drawdowns <br /> <br />o Negative FloodWay Surcharges <br /> <br />o Floodway Surcharges Greater Than Maximum Allowed by Community/State <br />o Water surface elevations higher than the end points of cross sections. <br />o Floodway discharge is different than the Natural 1 OO-year (base) flood discharge. <br />IZI Project causes 100-year floodplain or floodway elevations to increase (state if increases are located off the <br />requeste~s property) <br /> <br />explanation attached with Form 181 <br /> <br />Explanation provided on attached printout 0 <br /> <br />If Hydraulic model used is HEC-2, has It been checked with FEMA'S CHECK-2 computer program? 181 Yes <br />see Instructions for Information on how to obtain CHECK-2 <br />5. REVISED FIRM/FBFM AND FLOOD PROFILES <br /> <br />o No <br /> <br />1. Profile Transition <br /> <br />a. 100- Year Water-Surface Elevations - indicate the difference in water surface elevations where the project 100-year <br />elevations tie into the existing 100-year water surface elevations at each end of the project. <br /> <br />Downstream End 2430 within 0.00 (feet) <br />Cross-Section # <br /> <br />Upstream End ~ within 0.08 (feet) <br />Cross-Section # <br /> <br />b, Floodway Elevations - indicate the difference in water surface elevations where the project floodway elevations tie into <br />the existing floodway water surface elevations at each end of the project. <br /> <br />Downstream End t:!ffi within _ (feet) <br />Cross-Section # <br /> <br />Upstream End N1A within _ (feet) <br />Cross-Section # <br /> <br />c, Floodway widths - indicate the difference in floodway widths where the project fIoodway widths tie into the existing <br />width at each end of the project. <br /> <br />floodway <br /> <br />Downstream End N/A within _ (feet) <br />Cross-Section # <br /> <br />Upstream End N/A within _ (feet) <br />Cross-Section # <br /> <br />The following information (unless in parentheses) must be included at the same scale as the existing profiles for this project: <br /> <br />IZI Stream Name <br /> <br />IZI Community Name <br />IZI <br /> <br />o Corporate Limits labeled <br /> <br />o Study limits labeled <br />IZI Closs Sections labeled <br /> <br />o Confluences labeled <br /> <br />Channel Stationing <br /> <br />IZI Streambed profiled <br /> <br />IZI HorizontalNertical Scales indicated <br /> <br />IZI 1 OO-year elevs profiled' <br />IZI Low Chord Elevations <br /> <br />IZI Top of Road Elevations <br /> <br />IZI Road Crossings <br /> <br />IZI Labeled <br /> <br />'All recurrence intervals in the effective study must also be profiled, <br /> <br />Floodway Data Table <br /> <br />Attach a Floodway Data Table for each cross section listed in the published Floodway Data table in the FIS report. <br /> <br />Floodway Data Table Attached 0 Yes <br /> <br />181 Not Required <br /> <br />FEMA Form 81-89C <br /> <br />Riverine Hydraulic Analysis Form <br /> <br />MT -2 Form 4 Page 2 of 2 <br />