Laserfiche WebLink
<br />~ <br /> <br />I <br /> <br />4. ENCROACHMENT INFORMATION <br /> <br />1. Does the Slate have jurisdiction over the floodway or its adoption by communities participating in the NFIP? <br />181 Yes 0 No <br /> <br />I <br /> <br />If Yes, attach a copy of a letter notifying the appropriate State agency of the floodway revision and documentation of the <br />approval of the revised floodway by the appropriate State agency. <br /> <br />2. Does the development in the floodway cause the 1 % annual chance (base) elevation to increase at any location by more than <br />0.000 feet? 181 Yes 0 No 0 N/A <br /> <br />I <br /> <br />3. Does the cumulative effect of all development that has occurred since the effective SFHA was originally identified cause the base <br />flood elevation to increase at any location by more than one foot (or other increase limillf community or state has adopted more <br />stringent criteria - even if a floodway has not been delineated by FEMA)? 0 Yes 181 No <br /> <br />I <br /> <br />If the answer to either Items Is Yes, please attach documentation that all requirements of Section 65.12 of the NFIP <br />regulations have been met, regarding evaluation of alternatives, notice to Individual legal property ownel$, concurrence of <br />CEO, and certification that no insurable structures are impacted. <br /> <br />I <br /> <br />5. MAINTENANCE RESPONSIBILITY <br />perfonning <br /> <br />overseeing compliance with the maintenance <br /> <br />I <br /> <br />The community is willing to assume responsibility for <br />and operation plans of the Low Flow Culvert Crossino <br />(Name) <br />flood control structure. If not perfonned promptly by an owner other than the community, the community will provide the necessary <br />services without cost to the Federal govemment. <br /> <br />I 0 ration and maintenance lans are attached. <br /> <br />DYes 0 No <br />6. REVIEW FEE <br /> <br />181 NJA <br /> <br />I <br /> <br />The review fee for the appropriate request category has been included. 181 Yes Fee amount: $3.100 <br />OR <br />This request is based on a federally sponsored flood-control project where 50 percent or more of the project's cost is federally <br />sponsored, or the request is based on detailed hydrologic and hydraulic studies conducted by Federal, State, or local agencies to <br />replace approximate studies conducted by FEMA and shown on the effective FIRM; thus the project is fee exempt. <br />DYes <br /> <br />I <br /> <br />I Please see Instructions for Fee Amounts <br /> <br />7. SIGNATURE <br /> <br />Note: I understand that my signature indicates that all information <br />I submitted in support ofthis request is correct <br /> <br /> <br />Signature of Revision Requester <br /> <br />Printed Name and Title of Revision Requester <br /> <br />Date: <br />CERTIFICATION BY REGISTERED PROFESSIONAL <br />ENGINEER AND/OR LAND SURVEYOR <br />This certification is In acoordance with 44 CFR Ch. 1, Sect 65.2 <br /> <br />Signature <br /> <br />Printed Name and Title of Revision Requester <br /> <br />Regislr No. _ Expires (Date) _ State <br />Type of LicenselExpertise: <br /> <br />I FEMA Fonn 81-89 <br /> <br />Nole: Signature Indicates tIlat the community understands, from the <br />revision requester, the Impacts of the revision on flooding <br />conditions in the community. <br /> <br />Signalure of Community Official <br /> <br />Printed Name and Tille of Community Official <br /> <br />Community Name <br /> <br />Tele hone No.: Dale: <br />Check which forms have been Included with this request <br /> <br />Form Name and (Number) Reouired If ...... <br />o Hydrologic (3) new or revised discharges <br />181 Hydraulic (4) new or revised water-surface elevations <br />181 Mapping (5) ftoodplainllloodway changes <br />181 Channelization (6) channel is modified <br />181 Bridge/Culvert (7) addition/revision of bridge/allvert <br />o Levoe/Floodwall (8) addition/revision of leveeJftoodwall <br />o Coastal (9) new or revised coastal elevations <br />o Coastal Structures (10) addition/revision of coastal structure <br />o Dam (11) addition/revision of dam <br />o Alluvial Fan (12) structures proposed on alluvial fan <br /> <br />Revision Requester and Community Official Form <br /> <br />MT-2 Form 1 Page 2 of 2 <br />