My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD05175
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD05175
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:48:30 PM
Creation date
10/5/2006 1:18:17 AM
Metadata
Fields
Template:
Floodplain Documents
County
Summit
Community
Breckenridge
Stream Name
Blue River
Basin
Colorado Mainstem
Title
Technical Addendum Floodplain Information Blue River
Date
12/1/1974
Prepared For
Summit County
Prepared By
Leonard Rice Consulting Water Engineers, Inc.
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I. <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />INTRODUCTION <br /> <br />The report, "Flood'Plain Information, Breckenridge, Colorado" <br />presents data on flood hazards along the Blue River in the <br />vicinity of Breckenridge, Colorado. The report defines the <br />flood plain of the Blue River through the town of Breckenr idge <br />and presents discharges for the la-year, 25-year, Intermediate <br />Regional Flood, and Standard Project Flood at key points down- <br />stream from the town on the river. The purpose of this addendum <br />is to provide basic backup material used in the Breckenridge <br />flood plain report. The appendix contains var ious sample computer <br />printouts and other data relating to the hydrologic and hydraulic <br />determinations. <br /> <br />The secondary purpose of this addendum is to provide guidance to <br />the town of Breckenridge and Summit County for use in their plan- <br />ning efforts along the Blue River. Specific recommendations are <br />contained in this addendum relating to the capacities of the ex- <br />isting bridge and culverts crossing the Blue River, as well as <br />recommendations for future crossing structure capacities and <br />channel improvements. <br /> <br />The basis for recommendations and other planning information is <br />the Intermediate Regional Flood (IRF), or the lOa-year flood. <br />This flood has a 1% probability of being equalled or exceeded <br />during anyone year. The Intermediate Regional Flood is used <br />by the Flood Insurance Administration and is generally accepted <br />as the design flood for flood protection in the United States. <br />It must be recognized, however, that floods of greater magnitude <br />may occur. For this reason, the Standard Project Flood has also <br />been delineated on the flood plain maps. The runoff from a <br />Standard Project Flood is that runoff generated by a severe <br />combination of meteorological conditions reasonably character- <br />istic of the hydrologic region, excluding extremely rare combina- <br />tions. The Standard Project Flood (SPF) as used in this report <br />is generally considered as having a recurrence interval of approx- <br />" <br />imately once every 500 years. The Standard project Flood is not <br />the largest flood that can occur in the study area. For example, <br />the design flow used in the investigation for the safety of a <br />high hazard dam is that flow derived from the Probable Maximum <br />Storm. This storm is characteristic for any given region and is <br />dependent on a combination of physical and meteorological <br /> <br />~ Leonard Rice Consulting Water Engineers. Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.