Laserfiche WebLink
<br />" <br /> <br />~ <br /> <br /> <br />Federal Emergency Management Agency <br />Washington, D.C. 20472 <br /> <br />CERTIFIED MAIL <br />RETURN RECEIPT REQUESTED <br /> <br />IN REPLY REFER TO: <br />Case No,: 97-08-315P <br /> <br />The Honorable M, Michael Cooke <br />Chairman, Douglas County <br />Board of Commissioners <br />10 1 Third Street <br />Castle Rock, Colorado 80104 <br /> <br />Community: Douglas County, Colorado <br />Community No.: 080049 <br />Panel Affected: 0090 C <br />Effective Date of MAY 0 It 1998 <br />This Revision: <br /> <br />102-i-A-C <br /> <br />Dear Mr, Cooke: <br /> <br />This responds to a request that the Federal Emergency Management Agency (FEMA) revise the effective <br />Flood Insurance Rate Map (FIRM) and Flood Insurance Study (FIS) report for your community in <br />accordance with Part 65 of the National Flood Insurance Program (NFIP) regulations, In a letter dated <br />April 21, 1997, Mr. William Sweeney, Public Works Director, Town of Parker, requested that FEMA <br />revise the FIRM and FIS report to show the effects of placement of fIll at the Villages at Parker Elementary <br />School, construction of the Riva Ridge Street bridge, and more detailed topographic information along <br />Sulphur Gulch from approximately 2,300 feet downstream to approximately 9,800 feet upstream of Riva <br />Ridge Street. The revision was also extended upstream into Douglas County approximately 1,200 feet <br />upstream of County Road No, 9 (CR9) to the limit of detailed study, This request follows up in part on <br />a Conditional Letter of Map Revision issued on February 23, 1996, for an area from approximately <br />2,300 feet downstream to approximately 2,200 feet upstream of Riva Ridge Street. <br /> <br />All data required to complete our review of this request were submitted with letters from Mr, Eldon Von <br />Ohlen, P,E" P,L.S" EVO Consulting Services, Inc,; Mr. Fred H, Koch, P,E" Engineer, Douglas County; <br />Mr. Kumar R, Halbe, P,E" and Mr. Brian J, Poling, P,E" both Project Engineers with Merrick & <br />Company; Mr. Brad Robenstein, P,E" Drainage and Flood Control Engineer, Douglas County Public <br />Works Department; Ms, Georgia Simpson, RG Consulting Engineers, Inc,; and Mr. Sweeney, <br /> <br />We have completed our review of the submitted data and the flood data shown on the effective FIRM and <br />FIS report, We have revised the FIRM and FIS report to modify the elevations and floodplain and <br />floodway boundary delineations of the flood having a I-percent chance of being equaled or exceeded in <br />any given year (base flood) along Sulphur Gulch, As a result of the modifications, the base flood <br />elevations (BFEs) for Sulphur Gulch increased; the width of the Special Flood Hazard Area (SFHA), the <br />area that would be inundated by the base flood, increased in some areas and decreased in other areas; and <br />the width of the regulatory floodway increased in some areas and decreased in other areas, The <br />modifications are shown on the enclosed annotated copy of FIRM Panel(s) 0090 C, Profile Panel(s) 88P <br />through 93P, and affected portions of the Floodway Data Table, This Letter of Map Revision (LOMR) <br />hereby revises the above-referenced panel(s) of the effective FIRM dated September 30, 1987, and the <br />affected portions of the FIS report dated January 5, 1996, <br />