My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD05149
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD05149
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:48:25 PM
Creation date
10/5/2006 1:17:39 AM
Metadata
Fields
Template:
Floodplain Documents
County
Delta
Community
Delta
Stream Name
Gunnison, Uncompahgre Rivers
Basin
Gunnison
Title
Cost Estimates for Removal of Debris, Bank Protection and River Training Along the Uncompahgre, Gunnison and the North Fork of the Gunnison Rivers
Date
1/1/1980
Prepared For
Delta County
Prepared By
Mt Highland Engineering
Floodplain - Doc Type
Miscellaneous
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />- <br /> <br />Average Slope - 0.66% - average from a point 13,000 feet below the <br />3400 Road Bridge at the Town of Hotchkiss to the 4175 Road Bridge <br />upstream of the Town of paonia. <br /> <br />Depth of 100 year flood from centerline of channel - 6 to 9 feet <br /> <br />. Width and depth of channel to maintain a 100 year flood of 12,200 <br />cfs at the average slope (from Mannings Formula). <br /> <br />Channel <br />Depth <br /> <br />Channel <br />Width <br /> <br />6 <br />7 <br />8 <br />9 <br /> <br />210 <br />165 <br />135 <br />114 <br /> <br />Comparison of cross sections at each depth of reaches along river, <br />an average of 20 cubic yards per foot must be moved. <br /> <br />Comparative Costs <br /> <br />Case 1 If the entire reach was channeled to fit the above <br />applicable cross section: <br /> <br />76,275 ft x 20 yd3/ft = 1,525,500 yd3 <br />1,525,500 yd3 x $3/yd3 = <br /> <br />$ 4,576,500 <br /> <br />Case 2 - Based on the field surveys <br />channel only has to be cleared <br />protect specific critical areas: <br /> <br />and aerial photographs the <br />in certain reaches in order to <br /> <br />21,000 ft of heavy clearing <br />26,000 ft of light clearing <br />21,000 ft x 20 yd3/ft = 420,000 yd3 <br />26,000 ft x 10 yd3/ft = 260,000 yd3 <br /> 680,000 yd3 <br /> <br />680,000 yd3 x $3/yd3 = <br /> <br />$ 2,040,000 <br /> <br />C-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.