My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD05142
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD05142
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:48:23 PM
Creation date
10/5/2006 1:17:12 AM
Metadata
Fields
Template:
Floodplain Documents
County
Dolores
Community
Rico
Basin
San Juan/Dolores
Title
Floodplain Information Report
Date
9/1/2000
Prepared For
Rico
Prepared By
CWCB
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'I <br />I <br />I <br />I <br />:1 <br />i <br />II <br /> <br />PREFACE <br /> <br />This floodplain Information Report (FIR) is part of a program by the Colorado Water Conservation <br />Board (CWCB) to make approximate floodplain maps prepared by the Federal Emergency <br />Management Agency (FEMA) easier for local governments to use. This CWCB report provides <br />limited engineering information to support the approximate delineations on the FEMA maps, and it <br />provides floodplain management information to guide the local governments in the use of the maps. <br /> <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />II <br />I <br /> <br />The official floodplain information for Rico is the flood Insurance Rate Map (FlRM), dated August <br />5,1986. The ARM was prepared by FEMA and contains approximate floodplain delineations. In <br />addition, a flood hazard study containing flood hazard maps was prepared for the Town in 1995 by <br />Wilbur Engineering, Inc. This study contains both detailed and approximate floodplain <br />delineations. The approximate floodplains in the FEMA analysis do not include any engineering <br />information to describe basis of the approximate floodplain mapping. However, the approximate <br />floodplains in the Wilbur Engineering report contain some hydrology and hydraulics information. <br />Therefore, the initial purpose of this report is to provide the Town with limited supporting <br />information for the approximate floodplain delineations and verification of the Wilbur Engineering <br />report. This FIR includes a description of available hydrologic information for major flooding <br />sources within or adjacent to the Town. In addition, the FIR gives the Town some basic <br />information about floodplain management and it provides some alternatives that could be <br />considered in formulating and implementing floodplain management objectives. <br /> <br />A second function of this report is to assure that the ARM meets the basic technical requirements <br />for designation and approval by the CWCB. Without the inclusion of basic engineering <br />information, the approximate floodplain delineations shown on the Rico flood Insurance Rate <br />Maps cannot qualify for CWCB designation. Colorado statutes require that local governments <br />obtain from the CWCB the designation and approval of floodplain information for its use in <br />regulatory purposes. This FIR provides a means for the ARM to meet that statutory objective. As <br />new and more detailed floodplain information becomes available, the approximate floodplain areas <br />shown on the ARM panels will become superseded. The CWCB will designate and approve new <br />information, and rescind old information as appropriate. <br /> <br />ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.