My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD05142
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD05142
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:48:23 PM
Creation date
10/5/2006 1:17:12 AM
Metadata
Fields
Template:
Floodplain Documents
County
Dolores
Community
Rico
Basin
San Juan/Dolores
Title
Floodplain Information Report
Date
9/1/2000
Prepared For
Rico
Prepared By
CWCB
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />il <br /> <br />II <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />: I <br /> <br />FLOODPLAIN MANAGEMENT <br /> <br />Local Ordinance Requirements <br />Communities that manage their floodplains in Colorado do so most often through the local <br />regulatory process. This requires a community to adopt an ordinance or regulation, which sets <br />forth the performance standards by which development will occur in identified flood hazard <br />areas. Nationwide and in Colorado, regulations are enforced within the area of the l00-year <br />floodplain. <br /> <br />The basic requirement of these regulations is that new development and significant improvement <br />of existing development cannot occur in the l00-year floodplain without a floodplain <br />development permit being obtained. Obtaining such a permit requires compliance with <br />engineering standards. In communities like Rico that have approximate floodplain information, <br />the engineering standards have been more general. Structures must be built with materials and <br />techniques that "minimize flood damages". For communities that have detailed floodplain <br />information, more specific regulations would apply. The use of engineering techniques presented <br />in this report can help the Town to better regulate its approximate floodplain areas. <br /> <br />Flood Insurance <br />Flood insurance is made available to owners and occupants of floodprone property through the <br />federal government's National Flood Insurance Program (NAP). The federally backed flood <br />insurance is available to anyone in any community that participates in the NAP. At the time of <br />this publication, the Town of Rico is currently participating in the NAP, and officially joined the <br />regular program of the NAP on August 5, 1986. Communities become participants by adopting <br />floodplain regulations, adopting an NAP map (if one exists) and agreeing to cooperate with the <br />federal government in the local implementation of the NAP. Property owners and occupants can <br />then contact an insurance agent familiar with the NAP (perhaps their own agent) and purchase <br />insurance through that agent, much like they would purchase homeowner's insurance. Brochures <br />and other information regarding the National Flood Insurance Program can be obtained by calling <br />the Regional Office of the Federal Emergency Management Agency (FEMA) in Denver at (303) <br />235-4830. <br /> <br />Floodplain Manal!ement Alternatives <br />Besides floodplain regulations and flood insurance, there are many actions that can reduce the <br />risk of flood damage in a community. Generally these actions fall into two classes, structural <br />actions and non-structural actions. Structural actions involve the construction of facilities to <br />separate floodwaters from property that is at risk. They include construction of improved <br />channels, enlargement of crossing structures (bridges and culverts), levees and floodwalls, <br />reservoirs and ponds to detain floodwaters and diversion channels and pipes to direct waters <br />elsewhere. Non-structural actions usually involve removing people and/or structures from the <br />risk area without physically altering the floodplain. Actions include regulation of new <br />development, the adoption and enforcement of specific building code requirements, <br />floodproofing of existing buildings, relocation of structures to safer sites, acquisition of <br />floodplain (including buildings) for open space or other appropriate land uses, public education, <br />flood warning systems and emergency response programs. <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.