My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD05136
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD05136
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:48:22 PM
Creation date
10/5/2006 1:17:09 AM
Metadata
Fields
Template:
Floodplain Documents
County
Rio Blanco
Community
Meeker
Stream Name
Sulphur Creek
Basin
Yampa/White
Title
Town Of Meeker, CO Sulphur Creek Flood Control Project Phase II Improvements - 8 Sheets: General Construction Details
Date
6/1/1993
Prepared For
Meeker/CWCB
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br />'" <br />I <br />'" <br /> <br /> <br />GENERAL CONSTRUCTION NOTES <br /> <br /> N <br /> ~O <br /> UlO<O <br /> 1-<00 <br /> Ul ~COr-- <br />c -co <br />o .r-- <br />~ o .00> <br />...J Ot)N <br />o t) . I <br />~ Cl:: . UlIO <br />~ Ul0"<t <br />= 0Zo> <br /> I Z- <br /> _Cl::,-.. <br /> o Cl::c...1") <br />2S Z c...Ul 0 <br />< Ul I") <br /> 0-""" <br />~ Ul 00 . <br />Cl:: OOX <br />W 0;;::< <br />M:!J W;;::Zu... <br />Z ZW <br />[l= (3 ~<:5<o <br />Z 0 I") <br />@f: W 'N <br />.ON <br />o .-: <0 I <br />~ Z (/)-lO <br />i= X"<t <br />...J .<:: 0 0> <br />~ :::>.... <br />Ul CO (IJ ,-.. <br />Z N .1") <br />M:!J o oqo <br />t) I") c...C- <br /> <br />See Profile for Top <br />of Bonk Elevotion <br /> <br /> <br />2% SLOPE <br /> <br />Bose for Concrete Walls Sholl be <br />Smooth, Excavated Native Material. <br />Any Overexcavation Shall be Replaced <br />by Concrete or Compacted Closs 6 Roadbase. <br /> <br />See Profile for <br />Bottom Elevation <br />. <br /> <br />J <br /><0 <br />I <br /> <br /> <br />4" of Compacted 3/4-1nch (Closs 6) <br />Roadbase Grovel. 12 Feet Wide on Each <br />Side of Channel os Necessary to <br />Reconstruct Existing Roadwoys (Both Sides) <br /> <br />114 Bors @ 12" C.C. <br />Each Way <br /> <br />-~ <br /> <br />"~~ <br /> <br />",. <br />Q ~ <br />~ ~ <br /> <br />6"x3/16" Flat Dumbell- Type <br />Neoprene Water Stop, <br />Continuous, Both Sides <br /> <br />1. THE BIDDER SHALL EXAMINE THE PROJECT SITE AND VERIFY ALL WORK NECESSARY TO COMPLETE THE PROJECT. <br />2. THE CONTRACTOR MUST BE BONDED AND INSURED TO QUALIFY FOR CONSTRUCTION OF THIS PROJECT. <br />3. BIDDERS ARE ENCOURAGED TO PROPOSE CHANGES OR SUBSTITUTIONS FOR THE PROJECT; USE THE SUBSTITUTION <br />LISTING FORM. <br />4. PROJECT COMPLETION TIME IS 70 DAYS, WITH $200 PER DAY LIQUIDATED DAMAGES. <br />5. THE OWNER WILL PAY FOR QUALITY CONTROL TESTING; THE CONTRACTOR SHALL PAY FOR ANY RETESTING REQU- <br />IRED DUE TO FAILED TESTS. <br />6. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION, REPAIR, AND RELOCATION OF ALL UTILITIES. UTILITY <br />LOCATIONS KNOWN TO THE ENGINEER ARE SHOWN ON THE DRAWINGS. THE CONTRACTOR SHALL VERIFY LOCATIONS. <br />7. THE MEEKER TOWN DITCH WATER WILL BE SHUT OFF AFTER SEPTEMBER 6TH. EXCESS DITCH WATER WILL NOT BE <br />SPILLED INTO SULPHUR CREEK DURING CONSTRUCTION DUE TO NORMAL OPERATION OF THE DITCH. THE CON- <br />TRACTOR SHALL PROTECT ALL CONSTRUCTION EQUIPMENT AND IMPROVEMENTS FROM DAMAGE DUE TO RAINFALL <br />AND RUNOFF. <br />8. THE TOWN HAS STOCKPILED ROCK FOR RIP-RAP ON THE RIO BLANCO COUNTY PROPERTY NORTH OF GARFIELD <br />STREET (ADJACENT TO THE NORTH OF THE PROJECT SITE). THIS ROCK WILL BE AVAILABLE TO THE <br />CONTRACTOR AT THE UNIT COST BID ON THE BID SCHEDULE. THE QUANTITY OF ROCK AVAILABLE IS <br />NOT KNOWN. THE CONTRACTOR MUST LOAD AND HAUL THE ROCK. <br />9. ALL TOPSOIL SHALL BE STRIPPED, STOCKPILED, AND SPREAD OVER DISTURBED AREAS THAT ARE TO BE REVEGET- <br />ATED. NO TOPSOIL HAULED FROM OFF-SITE WILL BE REQUIRED UNLESS THE EXISTING TOPSOIL IS LOST. <br />10. ALL STRUCTURAL BACKFILL SHALL BE "CLASS COO NATIVE. ON-SITE SOIL MATERIAL. <br />11. CONCRETE SHALL BE 3000 PSI (28-DA Y COMPRESSIVE STRENGTH) EXCEPT BOTTOM SLABS, WHICH SHALL BE 5000 <br />PSI CONCRETE WITH COARSE (2") AGGREGATE AND FIBERMESH. <br />12. INSTALL FILTER FABRIC UNDER ALL RIP-RAP. <br /> <br /> <br />10' <br /> <br />4" of Compacted 3/4-inch <br />(Closs 6) Roadbose Grovel <br />Under All Concrete <br /> <br />Typical <br />Proposed <br />Station <br /> <br />Cross- Section <br />Concrete Channel <br />4+00 to 8+95 <br /> <br />1/4" = 1'-0" <br /> <br />(j) <br /> <br />.- <br /> <br />Existing 20' Channel <br /> <br />" <br /> <br />o <br />--f----! <br />Q) <br />o <br /> <br />T.W. 30.20- <br /> <br />---.-.'. -' <br /> <br />-..-..-'.' <br /> <br />-.----"" <br /> <br />..---"'--.' <br /> <br /> <br />ACESS ROAO <br /> <br />....... C <br />() 0 <br /><I> <br />.~ <br />0 .- <br />.... --f----! <br />0... <br />en U <br />-....... <br />o c <br />.... .... <I> :=J <br /><I> ~ E <br />"::'::0<1> L <br /><I> 0 > <br /><I> 0 --f----! <br />LU.... <br />'+-OE (j) <br />o 0 <br />lL.- C <br />c <br />;;::..::.:: 0 <br />o <I> <I> <br />f-<I>en <br />.... 0 U <br />O..c <br />....0... <br />:J <br />..c <br />0.. <br />:J 0 <br />(f) <br /> L <br /> Q) <br /> C <br /> Q) <br /> U <br /> <br />REMOVE ALL EXISTING CONCRETE BAFFLE BLOCKS <br />AND REPAIR CONCRETE TO A SMOOTH SURFACE <br /> <br /> <br />12" OF 6"-12" ROCK RIP-RAP (BOTTOM AND SIDES) I <br />GROUT FIRST 5' ADJACENT TO EXISTING STRUCTURE I <br />I <br />I <br />I Existing Cut-off WolI I <br />~----------------------------------~ <br /> <br />Station 2+50 <br />1/4" = 1'-0" <br /> <br />CROWN TOP OF WALL AND CAST <br />IN l"x 2" REVEALS (TYPICAL) <br /> <br />T <br /> <br />CROWN TOP OF WALL <br />0,.w. 38.7 <br /> <br />2"Xl" REVEAL <br /> <br />ct <br />I <br /> <br />TOW ELEV. 38.7' <br /> <br />BOF 29.4~ <br />,I- <br /> <br /> <br />CLASS C <br />STRUCTURAL BACKFILL <br /> <br />T <br /> <br />TOW ELEV. 38.7' <br /> <br />REVISIONS <br />DATE <br /> <br />BY <br /> <br />2" ASPHALT PAVING <br /> <br /> <br />CLASS C <br />STRUCTURAL BACKFILL <br /> <br />. <br /> <br />I <br /> <br /> <br />10' 118, <br />(WIDTH VARIES, SEE PLAj AND PROFILE DRAWING) <br />I <br /> <br />I <br /> <br />GRADE, TOPSOIL AND SEED ~___ <br />/- --' '\. <br />APPROXIMATE EXISTING GRADE '\,......... ,......... <br /> <br />10' ,......... <br /> <br />B" WALL <br />VERT. 114 0 18" c/c <br />HORZ. 114 0 lB" c/c <br /> <br /> <br />'" <br />.. <br /> <br />B" WALL <br />VERT. 114 0 18" c/c <br />HORZ. 114 4>> lB" c/c <br /> <br />. <br /> <br /> <br />16' <br /> <br />WAlL HEIGHT VARIES <br />-- ---- -."-... 7' - 11'1 <br />'''- <br />. 32.6 STA'~+75 <br />~34.8 STA 11-1:,55 <br />>< 37.2 STA 11+80 ""- <br /> <br />""- <br />"" <br /> <br />, <br />'" <br />.. <br /> <br />ELEV. 34.8' (STA. 11+55) <br /> <br />-I <br /> <br />/' <br /> <br />END WALL: 6" THICK. 2' WIDE <br />2 - 114 BARS VERTICAL <br />HORIZ. #4 0 18" C.C. <br /> <br />ElEV. 32.6' (STA. 10+75) <br /> <br />;" <br /> <br />. <br />~ <br /> <br />NOTE: <br />PROVIDE CONSTRUCTION JOINTS 2" DEEP <br />FROM EACH SIDE AT 15' SECTIONS. <br />PROVIDE 4"~ PVC WEEP HOLES AT <br />12" ABOVE FOOTER AT 10' c/c. <br />CONCRETE TO HAVE 3500 PSI STRENGTH IN <br />28 DAYS. MIN. AIR CONTENT - 77. BY VOLUME. <br />ALL EXPOSED FACES TO BE PATCHED <br />TO FILL SURFACE IMPRERFECTIONS FOLLOWiNG <br />FORM REMOVAL. <br /> <br />DATE <br />JUNE-1993 <br />SCALE <br /> VARIES <br />ENGINEER <br /> PJB <br />DWG FILE <br /> MKXSEC <br />JOB <br /> 319-01 <br />SHEET 6 <br /> <br />.".". ,:j <br /> <br />s' 4- <br /> <br />12" OF 6"-12" ROCK RIP-RAP (BOTTOM AND SIDES) <br /> <br />10" FOOTER <br />HORZ. #4 0 12" c/c <br />VERT. #4 0 g" c/c <br />EXTEND 3' <br /> <br />1 a" F'OOTFR <br />HORZ. 114 0 12" c/c <br />VERT. 114 0 g" c/c <br />EXTEND 3' <br /> <br />,-- --..- -"--'._- --.- -'.. <br /> <br />STATION 10+75 - 11+10 <br /> <br />STATION 11+10 - 11+55 <br /> <br />Typical Cross-Section, <br />Proposed Retain ing <br />(Station <br />1/4" = 1'-0" <br /> <br />Station 10+ 75 <br />Wall and Rip-Rap <br />11 +15 Shown) <br /> <br />to 11 + 80 <br />Channel <br /> <br />RETAINING WALL SECTIONS <br />1/4" = 1'-0" <br /> <br />OF <br /> <br />7 <br /> <br />SHEETS <br />
The URL can be used to link to this page
Your browser does not support the video tag.