Laserfiche WebLink
<br />The second plan would include a major bridge at County Line Road to convey <br />the flood back to the west side of the road. A bridge with approximately 130 <br />to 150 feet length and 12 feet clearance would be required. The added bridge <br />length is due to the skewed road crossing. Channel improvements would begin <br />at the Burlington Northern railrosd bridge and extend to the main Coal Creek <br />channel. Additional channel improvements would be required downstream to <br />Boulder Creek to prevent increased flooding damage. The water diverted from <br />th~ east side of County Line Road would increase flood depths and area extent <br />without cbannel improve~nts. <br /> <br />CHAPTER X <br />RECOMMENDED PLAN <br /> <br />I <br /> <br />The alternative plana described in Chapter VII were presented to the Tech- <br />nicsl Committee for review and selection of the optimum overall plan. The basic <br />advantages and disadvantages of each plan were compared with costs and poten- <br />tial benefits. Limited available construction funding waS a prime consideration <br />in the selection process. Also the flood protection objectives listed in <br />Chapter VIII were used in assessment of potential benefits. <br /> <br />The existing btidge at Kenosha <br />tures to provide flood protection. <br />be prevented by a larger bridge aC <br /> <br />Road does not <br />InundatIon oC <br />this location. <br /> <br />warrant improvement expendi- <br />the roads in the area cannot <br /> <br />The location of the capital i~provements recommended for the study reach <br />are shown On Plates 12 through 15. Table-II presents the recommended plan <br />items. Typical details of channel improvements and dikes are shown on Plate <br />16. Approximate quantities and cost estimates Cor the recommended plan are <br />listed in Table-12. The engineerIng and contingencies costs are intended to <br />include the coscs of preparing construction plans and specIfications and of <br />administering the contracts. <br /> <br />In the event the proposed improvements are not constructed, it is re- <br />commended that appropriate floodplain management procedures be implemented. <br /> <br />- 80 - <br /> <br />- 81 - <br />