Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />The 500-year flood profile is not computed because of a <br />lack of topographic data. Therefore, no change is <br />requested to be made to the SOD-year flood plain at this <br />location. <br /> <br /> <br />Also, because the loo-year flood plain is contained in <br />the channel and the culverts, no encroachment run was <br />performed to determine the floodway. We request that the <br />100-year floodway be coincidental with the 100-year flood <br />plain. <br /> <br />IV. SUMMARY <br /> <br />This HEC-2 run is tied to existing cross-sections of the Flood <br />Insurance Study (F.I,S,). AS shown below, the computed water <br />surface elevations at the tie-in sections are very close: <br /> <br />*Upstream tie--in: Section E <br /> <br />Study Report <br />This submittal <br />F.r.S. <br />1982 request for <br /> <br />Section No. <br />12.0 <br />E <br />FIRMA 12,0 <br /> <br />Water Surface Elevation <br />372.13 <br />372.15:1: <br />372,08 <br /> <br />*Downstream tie-in: Section 8,0 of the F.I.S. (1977 plan and <br />profile drawing) <br /> <br />This submittal <br />F. r.s. <br /> <br />section 8.0 <br />Section 8.0 <br /> <br />362.32 <br />362,0:1: <br /> <br />Tie-in 100-year flood plain limits are plotted on sheet 4 of <br />the drawings. <br /> <br />According to the HEC-2 run output, the new box culverts under <br />Sable Boulevard have the required capacity to pass the 100- <br />year flow in Sable Ditch, The intersection of Sable Boulevard <br />and 23rd Aven'.le is no long-er flooded in a 100-year storm <br />event. Therefore, we request that a Letter of Map Revision be <br />issued to change the lao-year flood plain limits at that <br />intersection, between Section 8.0 and Section 12.0, <br /> <br />It should be noted that Sable Ditch downstream of Section 8.0 <br />(downstream end of the box culverts) was also improved and <br />channelized and should be able to carry the lOa-year flood <br />within the channel. But this will be addressed in a future <br />request for flood plain revisions, at that time when the <br />downstream culverts under Interstate 1-225 are improved, <br /> <br />Prepared by: <br />!VOZU'lfvC1.,o..f'"" I P ,::- . <br />Hoanh Tran, P.E, <br /> <br />Reviewed by: <br /> <br />~a/~?-E. <br /> <br />Kevln Wegener, P,E. <br /> <br />-4- <br />