My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD05075
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD05075
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:48:10 PM
Creation date
10/5/2006 1:14:58 AM
Metadata
Fields
Template:
Floodplain Documents
County
Adams
Community
Adams County and Unincorporated Areas
Stream Name
South Platte River
Basin
South Platte
Title
LOMR - Affected Panel 08001C0335 G - Case No. 04-08-0577P
Date
5/11/2005
Prepared For
Adams County
Prepared By
FEMA
Floodplain - Doc Type
Historic FEMA Regulatory Floodplain Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Page 30f5 <br /> <br />Tissue Date: IAN <br /> <br />- <br />~}!ARl'~).. <br />.,.~' <br />",~a <br />. <br /> <br />1 8 2005 I Effective Date: MAY 1 1 2005 I Case No.: 04-08-0S77P <br /> <br />I LOMR,APP <br /> <br />" <br /> <br />Federal Emergency Management Agency <br />Washington, D.C. 20472 <br /> <br />LETTER OF MAP REVISION <br />DETERMINATION DOCUMENT (CONTINUED) <br /> <br />COMMUNITY INFORMATION <br /> <br />APPLICABLE NFIP REGULATIONS/COMMUNITY OBLIGATION <br /> <br />We have made this determination pursuant to Section 206 of the Flood Disaster Protection Act of 1973 (P.L. 93-234) and in accordance <br />with the National Flood Insurance Act of 1968, as amended (Title XIII of the Housing and Urban Development Act of 1968, <br />P.L. 90-448),42 U.S.C. 4001-4128, and 44 CFR Part 65. Pursuant to Section 1361 of the National Flood Insurance Act of 1968, as <br />amended, communities participating in the NFIP are required to adopt and enforce floodplain management regulations that meet or <br />exceed NFIP criteria. These criteria, including adoption of the FIS report and FIRM, and the modifications made by this LOMR, are the <br />minimum requirements for continued NFIP participation and do not supersede more stringent State/Commonwealth or local requirements <br />to which the regulations apply. <br /> <br />We provide the floodway designation to your community as a tool to regulate floodplain development. Therefore, the floodway revision <br />we have described in this letter, while acceptable to us, must also be acceptable to your community and adopted by appropriate <br />community action, as specified in Paragraph 60.3(d) of the NFIP regulations. <br /> <br />NFIP regulations Subparagtaph 6\l.3(b){7) requires communities to ensure \hat the flood-carrying capacity within the altered or relocated <br />portion of any watercourse is maintained. This provision is incorporated into your community's existing floodplain management <br />ordinances; therefore, responsibility for maintenance of the modified channel rests with your community. We may request that your <br />community submit a description and schedule of cbannel activities. <br /> <br />COMMUNITY REMINDERS <br /> <br />We based this determination on the I-percent-annual-chance flood discharges computed in the FIS for your community without <br />considering subsequent changes in watershed characteristics that could increase flood discharges. Future development of projects <br />upstream could cause increased flood discharges, which could cause increased flood hazards. A comprehensive restudy of your <br />community's flood hazards would consider the cumulative effects of development on flood discharges subsequent to the publication of <br />the FIS report for your community and could, therefore, establish greater flood hazards in this area. <br /> <br />Your conununity must regulate all proposed floodplain development and ensure that permits required by Federal and/or <br />State/Commonwealth law have been obtained. State/Conunonwealth or community officials, based on knowledge oflocal conditions and <br />in the interest of safety, may set higher standards for construction or may limit development in floodplain areas. If your <br />State/Conunonwealth or community has adopted more restrictive or comprehensive floodplain management criteria, those criteria take <br />precedence over the minimum NFIP requirements. <br /> <br />This determination is based on the flood data presently available. The enclosed documents provide additional information regarding this determination. If <br />you have any questions about this document, please contact the FEMA Map Assistance Center toll free at 1-877-336-2677 (1~8n-FEMA MAP) or by letter <br />addressed to the lOMR Depot, 3601 Eisenhower Avenue, Alexandria, VA 22304. Additional information about the NFIP is available on our website at <br />htto:l/www.fema.oov/nfio. <br /> <br />~e~ <br /> <br />I <br /> <br />Kevin C. long, CFM, Project Engineer <br />Hazal<! 'denlilicaijon Seclion <br />Mitigation DMsion <br />EmernenlW Prenaredness and Resnonse Directorate <br /> <br />10292910.1.1.04080577102IAC <br />
The URL can be used to link to this page
Your browser does not support the video tag.