My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD05005
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD05005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:47:57 PM
Creation date
10/5/2006 1:10:52 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
State of Colorado
Basin
Statewide
Title
State Of Colorado Dam Safety Manual
Date
6/1/1983
Prepared By
Colorado State Engineers Office
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />17 <br /> <br /> <br />CONTROLLED SEEPAGE <br /> <br />FIGURE 3.4-7 <br />ZONED WITH DRAIN <br /> <br />The drain is a method of controlling the seep- <br />age of water through a dam. Water entering the <br />drain flows freely through the drain and exits <br />safely beyond the dam without wetting the <br />material in the downstream zone. <br /> <br />Most older dams in Colorado are homogene- <br />ous. A method used to control seepage on some <br />of the older dams was to stop the water at the <br />source, by placement of a barrier of steel or <br />concrete on the upstream face of the dam. <br /> <br />NO CUTOFF <br /> <br /> <br />UPSTREAM <br />BARRIER <br /> <br /> <br />FIGURE 3.4-10 <br />FLOW PATH IN COARSE MATERIAL WITHOUT CUTOFF <br /> <br />Extending the barrier into the foundation to <br />control the flow of water under the dam is <br />important. <br /> <br />If the foundation has low resistance to the flow <br />of water, for instance, through fractured rock <br />or a sand layer, the most effective means of <br />reducing the flow of water through the founda- <br />tion is a cutoff. Often the core is extended into <br />the foundation by digging a trench along the <br />length of the dam and filling it with the flow- <br />resistant material. The sketch below shows <br />how the cutoff trench controls the flow ofwater <br />through the foundation. Controlling flow is <br />necessary to prevent excessive loss of reservoir <br />water and assure the staj,;lity ofthefoundation. <br /> <br />FIGURE 3.4-8 <br />UPSTREAM BARRIER <br /> <br />3.4-2 FOUNDATION CUTOFF <br />Extending the barrier into the foundation, as <br />shown below at Point A, also helps to control <br />the flow of water through the foundation. <br /> <br /> <br />SAND 0\ GRAVEL <br />a. Cutoff Too Shallow <br /> <br />~ <br /> <br /> <br /> <br />~.. :....'. .-:. <br /> <br />~.~ :0 <br /> <br />SAND 0\ GRAVEL <br /> <br />b. Effective Cutoff <br /> <br />FIGURE 3.4-9 <br />BARRIER EXTENDED INTO FOUNDATION <br /> <br />Without the extension (cutoff), water will go <br />under the barrier and exit at the base of the <br />embankment, defeating the purpose of the <br />barrier. <br /> <br />FIGURE 3.4-11 <br />CUTOFF TRENCH <br /> <br />Many of the principles of earth dams also apply <br />to the behavior of rockftll dams. <br />
The URL can be used to link to this page
Your browser does not support the video tag.