My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04994
CWCB
>
Floodplain Documents
>
Backfile
>
4001-5000
>
FLOOD04994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:47:55 PM
Creation date
10/5/2006 1:10:26 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
na
Basin
Statewide
Title
Guidelines on Selection of Acceptable Flood Capacity for Dams
Date
3/1/2000
Prepared By
Australian National Committee on Large Dams
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I, <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1. ASSOCIAnD FACTORS. <br /> <br />17 <br /> <br />7.1. CONDITIONAL PROBABILITY OF FAILURE; HYDROLOGIC SAFETY ASSESSMENT, <br />7.2. RIsK TO LIFE CRITERIA. <br />7.3. W~G AND EVACUATION PLANS, & NON-STRUC11JRAL OPTIONS. <br /> <br />17 <br />18 <br />19 <br /> <br />8. AFC SCREENING PROCESSES. <br /> <br />20 <br /> <br />8.1, APPLICATION OF A FALLBACK OPTION, <br />. 8,2, FALLBACK ALTERNATIVE. <br /> <br />21 <br />21 <br /> <br />9. FLOOD MANAGEMENT CONSIDERATIONS. <br /> <br />22 <br /> <br />9.1. GATED SPILLWAYS. <br />9.2. JOINT PROBABILITIES. <br />9.3. FLOOD MITIGATION DAMS. <br />9.4, CONS1RUCTION FLOODS. <br />9.5, MINING DAM SPILLWAY PROVISIONS. <br /> <br />22 <br />22 <br />23 <br />23 <br />24 <br /> <br />REFERENCES <br /> <br />26 <br /> <br />GLOSSARIES <br /> <br />PART I: DAM AND FLOOD TERMINOLOGY <br />PART 2. - RISK TERMINOLOGY <br /> <br />30 <br />32 <br /> <br />APPENDICES <br /> <br />37 <br /> <br />APPENDIX 1: ESTIMATION OF DAM CREST FLOOD (DCF) AND ASSOCIATED ANNuAL <br />EXCEEDANCE PROBABILITY (AEP) <br />APPENDIX 2: COMMENTARY <br />APPENDIX 3. RISK SUPPLEMENT <br /> <br />ANCOLD Guidelines on Selection of an Acceptable flood Capacity for Dams <br />
The URL can be used to link to this page
Your browser does not support the video tag.