Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Appendix 2: Commentary <br /> <br />TABLE of CONTENTS <br /> <br />Page <br /> <br />A2.1. BACKGROUND <br /> <br />A2-3 <br /> <br />A2.2. RELATED GUIDELINES <br /> <br />A2-4 <br /> <br />A2.3. IMMINENT FAILURE FLOOD (IFF, SCF, DCF) <br />A2.3.I, The Term IFF <br />A2.3.2. TheTerm SCF <br />A2.3.3. Dam Crest Flood <br />A2.3.4. Safety & Failure Stages <br />A2.3.5. Imminent Failure Condition <br /> <br />A2-5 <br />A2-5 <br />A2-5 <br />A2-5 <br />A2-6 <br /> <br />A2.4. SPILLWAY ARRANGEMENTS <br />A2.4, L Proposed Dams <br />A2.4.2. Existing Dams <br />A2.4.3. Unlined Spillways <br /> <br />A2-6 <br />A2-7 <br />A2-7 <br /> <br />A2.5, FLOOD ROUTING & FREEBOARD ESTIMATION <br />A2.5.1. Flood Routing <br />A2.5.2. Freeboard Provision <br />A2.5.3. Factors to Assess <br />A2.5.4. Deterministic Basis <br />A2.5.5. Risk Basis <br />A2.5.6, Decision <br />A2.5, 7, References <br /> <br />A2-7 <br />A2-8 <br />A2-8 <br />A2-8 <br />A2-8 <br />A2-9 <br />A2-9 <br /> <br />A2.6. WARNING & EVACUATION PLANS <br /> <br />A2.7, FALLBACK OPTION <br />A2,7.1. Background <br />A2,7.2. Fallback Provision <br />A2,7.3. Base Safety Condition <br /> <br />A2-9 <br /> <br />A2-IO <br />A2-1O <br />A2-1O <br />A2-1I <br /> <br />A2.8, CONSTRUCTION FLOODS <br />A2.8, L General Considerations <br />A2.8.2. 1986 ANCOLD Guidelines <br />A2,8,3. Proposed Dams <br />A2.8,4. Existing Dams <br />A2.8.5. Guidelines <br /> <br />A2-12 <br />A2-I2 <br />A2-I2 <br />A2-I2 <br />A2-13 <br /> <br />A2,9. MINING DAM SPILLWAY PROVISIONS <br /> <br />A2-13 <br /> <br />A2JO. FLOOD MlTIGATION <br /> <br />A2-13 <br /> <br />A2-2 ANCOLD Guidelines on Selection of an Acceptable flood Capacity for Dams <br />