Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Al-4 <br /> <br />If <br />.~ <br /> <br />For regulatory purposes to the 1986 Guidelines, to provide consistency in assessing the potential need <br />for upgrading, the first assumption was generally considered the most appropriate. In the current risk <br />assessment context, for estimation of DCF, the second assumption, that the dam is overtopped <br />without it failing, is the more realistic case and is preferred for extrapolation of the spillway rating <br />curve. <br /> <br />Notwithstanding the above considerations, it should be noted by definition, the spillway rating curves <br />will be identical upto the crest level of the dam, and consequently the outflow frequency curves to the <br />point ofDCF should be coincident. The AEP of the DCF should be the same regardless of the method <br />adopted for extrapolation of the spillway-rating table beyond this point. <br /> <br />However, in practice, if a sufficient number of points is not used to define the outflow frequency curve <br />(particularly in the area of the curve proximate to the DCF discharge), the method of extrapolation <br />adopted will resuh in different values of AEP of the DCF. This is particularly so if the outflow <br />frequency curve is derived by applying the shape factors directly to outflow floods rather than by <br />routing a range of inflow floods through the storage, It should be noted that for this reason it is <br />recommended that outflow frequency curves should be obtained by the routing of inflow floods rather <br />than by the direct application of shape factors to selected ordinates of the outflow frequency curve. <br /> <br />4, The result should be qualified on the assumptions made for initial reservoir level. <br /> <br />5, The paper, "Improved Estimates of Hydrologic Risk for Dams -Impacts of the New Flood <br />Guidelines", Hill, Nathan, Weinmann & Green, 1999 ANCOLD Conference on Dams, Proceedings, <br />pp 83-91, provides information on the various factors in the revised flood estimation procedures. <br /> <br />Fig A1.1 Flood Frequency Cmves <br /> <br />100000 <br /> <br />~ <br />" <br />ii' <br />~ <br />~ <br />~ <br />U <br />en <br />o <br /> <br /> <br />> <br /> <br />10000 <br /> <br />10" lO,j 10"" 10.1 IO.a <br /> <br />ANNUAL EXCEEDANCE PROBABILITY <br /> <br />ANCOLD Guidelines on Selection of an Acceptable flood Capacity for Dams <br />